Maiden Ore Reserve Defined Lake Resources Flagship Kachi Pro
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
19 December 2023
Maiden Ore Reserve Defined Lake Resources Flagship Kachi Project
Lake Resources N.L. (ASX: LKE; OTC: LLKKF) (“Lake” or the “Company”) is pleased to announce its
maiden Ore Reserve statement for the Kachi lithium brine project (“Kachi” or the “Project”) in Argentina.
The basis for this Ore Reserve statement is hydrogeologic modelling completed for the Project that
incorporates the recent Mineral Resource Estimate 1 and extensive hydrogeological characterisation work
completed in 2022 and 2023 including extraction and injection testing 2.
This Ore Reserve is the basis for the Kachi Project Phase One Definitive Feasibility Study (“DFS”), which
was released today. The Ore Reserve demonstrates that the mine plan is capable of delivering sufficient
lithium brine to the plant for a planned 25 ktpa operation over the Life of Mine (“LoM”).
Ore Reserve demonstrates mine plan capable of delivering sufficient lithium brine
for planned 25 ktpa operation:
•
Mine plan includes 16 production wells and 21 injection wells with average grades and flow rates that
exceed production requirements for a 25 ktpa 3 operation for a 25-year LoM.
•
Ore Reserve is constrained by currently planned plant capacity of 25,228 tpa, not pumping and
injection capacities.
•
Kachi well field layout optimized using the Hydrogeologic Model to maximize lithium grade recovered,
maximize Proved Ore Reserve and minimize environmental impacts.
•
Average lithium feed grade to the plant for the first seven years of operations is 257 mg/L, averages
245 mg/L in years eight to 25 and reduces to 232 mg/L by year 25.
•
More than 85% of the 25-year Life-of-Mine (“LoM”) production is derived from Measured Resources
with the remained predicted to be sourced for Indicated Resources.
"We are excited to share the well field development plan and hydrogeologic modeling results for the
Project. The modeling demonstrates that the feed grade will average above 245 mg/L with minimal dilution
and that the operation can be developed in an environmentally responsible manner," Michael Gabora,
Director of Geology and Hydrogeology said. He continued, "The Ore Reserve for the 25 ktpa operation
extracts just a small percentage of the Mineral Resource Estimate."
1
See LKE ASX Announcement dated 22 November 2023
2
See LKE ASX Announcement dated 16 August 2023
3
Abbreviations summary: Tonnes per annum (tpa), Million Tonnes (Mt), Lithium Carbonate Equivalent (LCE), meters (m), square
kilometers (km2), milligrams per liter (mg/L), Life-of-Mine (LoM)
Other Highlights
•
Reducing the simulated LCE production to the expected plant throughput results in a Proved and
Probable Ore Reserve of 624,400 tonnes LCE (see Table 1). The mine plan produces 806,300 tonnes
LCE, representing less than 12% of the Measured and Indicated Mineral Resource 4.
•
The Proved Ore Reserve derived from Measured Resources is constrained to the first seven years of
operation, equalling 170,300 tonnes.
•
Ore Reserves from Measured Resources in years eight to 25 are conservatively categorised as
Probable Ore Reserves with the aspiration that these will convert to Proved Reserves as the
predictive reliability of the hydrogeologic model increases with additional data collection.
•
The defined injection strategy maintains higher reservoir pressures and minimises potential
environmental impacts.
•
Dilution in lithium grade is predicted to be <2% in year seven and about 10% in year 25. This
principally occurs because of capturing slightly lower grade brine and dilution from spent brine
injection.
•
The hydrogeologic model reproduces historical data very well, which improves the predictive reliability
of the model simulations related to lithium recovery and injection.
“All the Ore Reserve for the first seven years of operations is in the Proved Ore Reserve category which
demonstrates the high level of confidence in the data and modelling work completed to date. More than
90% of the lithium brine continues to be derived from the Measured Resource through the LoM, but the
Competent Person (“CP”) has allocated this to the Probable Ore Reserve category. Continued data
collection and model updates will most likely result in further upgrades to the Proved Ore Reserve, given
the favourable conditions,” Mr. Gabora said.
A variable density groundwater flow and solute transport model (“Hydrogeologic Model”) was developed
using the Groundwater Vistas interface and MODFLOW-USG 5 code to evaluate the extraction of lithium
enriched brine and injection of spent brine after direct lithium extraction (“DLE”) from the wells during the
25-year LoM. The Hydrogeologic Model was constructed based on the geologic framework model
developed for the Mineral Resource estimate4. The Hydrogeologic Model incorporates the water balance
studies 6, local scale evapotranspiration studies 7, and hydraulic testing work 8. To demonstrate the model's
ability to reproduce measured conditions in the basin, it was calibrated to historical observations of lake
stage at the “laguna” from 2000 to 2023, evapotranspiration fluxes determined from studies, historical
groundwater and brine levels, changes in brine levels during extraction and injection testing, lithium
concentrations during extraction tests, and to a lesser extent, the total dissolved solids concentrations.
4
See LKE ASX Announcement dated 22 November 2023
Panday, S. 2023. MODFLOW-USG-Transport (v2.2.1). GSI. Available at: http:// http://www.gsi-net.com/en/software/freesoftware/USG-Transport.html
5
Lithium Solutions, 2023. Hydrophysical Water Budget Assessment and Hydrogeochemical and Isotopic Tracing of Water Source
and Transit in Carachi Pampa Basin, Argentina
6
7
Atacama Water, 2022. Kachi Project - Soil evaporation measurements, wet season 2022. April 2022
8
See LKE ASX Announcement dated 16 August 2023
2
The Ore Reserve estimate considers the Modifying Factors of converting Mineral Resources to Ore
Reserves, including the production and injection well field designs and efficiency (e.g., location, drilling
and well construction details, pumping requirements, etc.), environmental considerations (e.g., changes at
key environmental receptors), lithium recovery rates, and plant capacity and is based on the same
material assumptions as the DFS. The mine plan produces well field flow rates and concentrations in
excess of plant requirements, which provides an additional factor-of-safety that the production schedule
can be achieved, even if small changes in ramp-up and ramp-down schedules are implemented. As a
result, plant capacity is the limiting factor for the Ore Reserve based on the mine plan presented in this
announcement.
The Ore Reserve was classified into Proved Ore Reserves and Probable Ore Reserves based on industry
standards 9 for lithium brine projects, the CP’s experience, and the confidence in the quality and quantity of
both data and hydrogeologic model performance. A majority of the extracted mass is sourced from
Measured Resources; nonetheless, Proved Ore Reserves were specified by the CP for the first seven
years, given the level of model calibration and yearly production goals (see Table 1). Probable Ore
Reserves were conservatively assigned for the last 18 years of the LoM, considering that the model will be
continually improved and recalibrated in the future, including additional extraction and injection testing,
initial operations, and measurements of dilution, among other factors. Lake has discussed the potential for
future Project Phases that would see a further increase in the production, but these phases are not
included in this Ore Reserve Statement.
The Project well field development plan consists of 16 extraction wells and 21 injection wells in the
configuration shown in Figure 1. The Phase 1a wells will be drilled and operated for six months, after
which Phase 1b wells will be online. The final two injection and extraction wells (back-up wells) will be
online by the start of year two. The extraction is focused on the core of the salar where lithium
concentration has been consistently high, and three long-term pumping tests (12 to 31-days in length).
Injection wells are located in the coarse-grained alluvial fan materials in the west and along the eastern
margin of the central resource area. The injection configuration provides pressure maintenance in the
production horizon and near springs along the western margin of the volcano, while keeping dilution
resulting from spent brine injection to a minimum.
9
Association of Mining and Exploration Companies, 2020. Guidelines for Resource and Reserve Estimation for Brines.
https://www.jorc.org/docs/Brine_Guideline_final.pdf
3
Table 1. Proved and Probable Lithium Reserves
Reserve Category
Years
Lithium
(Tonnes)
(Tonnes)
LCE
Average Lithium
Proved
1
3,600
18,900
258.6
Proved
2-7
28,500
151,400
257.2
Probable
8-25
85,400
454,100
245.0
Total
1-25
117,400
624,400
(mg/L)
Notes to the Ore Reserve Estimate:
•
Lithium is converted to lithium carbonate (Li2CO3) equivalent with a conversion factor of 5.32.
•
The effective date for the Ore Reserve Estimate is based on the resource update from November 22,
2023 10.
•
The Ore Reserves are estimated based on the output from the processing circuit, as the 75%
processing efficiency is accounted for in the Ore Reserve estimates.
•
Numbers may not add due to rounding effects.
•
Projected processing is based on first year rate of 18,921 tonnes LCE.
•
Projected processing for years two to 25 rate of 25,228 tonnes LCE.
•
The CP for the Ore Reserve estimate is Andrew Fulton.
10
See LKE ASX Announcement dated 22 November 2023
4
Figure 1. Modelled well field layout for extraction and injection wells
5
Mr. Gabora said the maiden Ore Reserve statement demonstrates some of the great advantages of DLE
and injection of spent brine. “The impacts to the hydrogeologic system are vastly reduced over traditional
processing methods as a result of returning the spent brine back into the hydrogeologic system. This
effectively maintains pressures in the system, providing both operational and environmental benefits.”
Summaries of the Project Background, Mineral Resource and Ore Reserve analysis are provided in
subsequent sections.
Lake Investors please contact:
Global IR: Karen Greene, SVP, Investor Relations, Lake Resources:
karen.greene@lakeresources.com.au
For media queries, please contact:
Nigel Kassulke at Teneo
M: +61407904874
E: Nigel.Kassulke@teneo.com
About Lake Resources NL (ASX:LKE OTC:LLKKF)
Lake Resources NL (ASX:LKE, OTC: LLKKF) is a responsible lithium developer utilising state-of-the-art
ion exchange extraction technology for production of sustainable, high purity lithium from its flagship Kachi
Project in Catamarca Province within the Lithium Triangle in Argentina. Lake also has three additional
early-stage projects in this region.
This ion exchange extraction technology delivers a solution for two rising demands – high purity battery
materials to avoid performance issues, and more sustainable, responsibly sourced materials with low
carbon footprint and significant ESG benefits.
Forward Looking Statements:
Certain statements contained in this announcement, including information as to the future financial
performance of the projects, are forward-looking statements. Such forward-looking statements are
necessarily based upon a number of estimates and assumptions that, while considered reasonable by Lake
Resources N.L. are inherently subject to significant technical, business, economic, competitive, political and
social uncertainties and contingencies; involve known and unknown risks and uncertainties and other factors
that could cause actual events or results to differ materially from estimated or anticipated events or results,
expressed or implied, reflected in such forward-looking statements; and may include, among other things,
statements regarding targets, estimates and assumptions in respect of production and prices, operating
costs and results, capital expenditures, reserves and resources and anticipated flow rates, and are or may
be based on assumptions and estimates related to future technical, economic, market, political, social and
other conditions and affected by the risk of further changes in government regulations, policies or legislation
and that further funding may be required, but unavailable, for the ongoing development of Lake’s projects.
6
Lake Resources N.L. disclaims any intent or obligation to update any forward-looking statements, whether
as a result of new information, future events or results or otherwise. The words “believe”, “expect”,
“anticipate”, “indicate”, “contemplate”, “target”, “plan”, “intends”, “continue”, “budget”, “estimate”, “may”,
“will”, “schedule” and similar expressions identify forward-looking statements. All forward-looking statements
made in this announcement are qualified by the foregoing cautionary statements. Investors are cautioned
that forward-looking statements are not guarantees of future performance and accordingly investors are
cautioned not to put undue reliance on forward-looking statements due to the inherent uncertainty therein.
Lake does not undertake to update any forward-looking information, except in accordance with applicable
securities laws.
7
Maiden Ore Reserve Report
The Project background and modelling work completed to define the Ore Reserve and related Modifying
Factors are discussed in the following report.
Project Background
The Kachi Project is located on the Carachi Pampa basin at the south end of the Puna geographical
region, Argentina (Figure 2). The modern-day Puna Region is the southern continuation of the Bolivian
Altiplano with an average elevation of 4,400 meters (m) above mean sea level (amsl), although Project
elevations are considerably lower, about 3,010 m amsl, which provides considerable advantages from
climate and operations perspectives.
Figure 2. Kachi Project Location and Layout
8
Property Holdings
Lake Resources holds 53 mineral leases (“Minas”) in the Basin covering the surface of the salar and
surrounding areas (Figure 3). The mineral leases are summarized in Table 14 (following the text), with
the property names, file numbers, and details of the approvals related to each of the concessions.
All information regarding the legal status of the properties was provided by Morena del Valle Minerals SA
(“MVM”); the local subsidiary of Lake Resources in the Province of Catamarca. The status of properties
has not been independently verified by the CP, who takes no responsibility for the legal status of the
concessions.
Figure 3. Kachi Project Mineral Concessions
Note: Galan Oeste and Tornado VII are not currently part of Kachi Project mine plan
9
Geology and Geological Interpretation
The Carachi Pampa basin is an arid, closed basin comprised of interbedded lacustrine and alluvial
sediments of gravels, sands, silts, and clays, with episodic volcanic deposits of ignimbrites, tuffs, and
basalts (Figure 4). The basin is bounded to the east and west by north-south trending mountain ranges
formed by thrust faulting exposing basement sequences in outcrops that rise to an elevation of about
5,100 m amsl. The Cerro Blanco pyroclastic complex is located on the south of the basin and is the
primary source of the pyroclastic flows that deposited the ignimbrites and tuffs, while the Antofagasta de la
Sierra and the Cerro Galan volcanic complex form the highlands in the north and northeast borders of the
basin. The ranges to the east are composed of crystalline pre-Cambrian basement that gently slopes
down to the basin floor. Red bedded sandstone and claystone sequences of the Geste and Patqia de la
Cuesta Formations outcrop in the Los Colorados Range along the western edge of the basin. Extensive
alluvial fan deposits were formed to the north, south, east and west of the central salar, as coarse-grained,
high-energy sediments were shed from the nearby steep terrains. Altogether the basin drains a watershed
area of 9,494 km2.
Figure 4. Geology of the Kachi Project Area
10
The center of the basin is dominated by the Quaternary basalt flows and the cider-cone of the Carachi
Pampa Volcano. The volcano penetrates basin sediments to the east of the salar, with flow and air fall
basalts creating a veneer over the lacustrine sediments. The volcano has a northwest-southeast striking
fissure vent that is interpreted to be underlain by a northwest-southeast aligned intrusive dyke or plug of
much smaller dimensions than the basalt cone has at the surface.
Salars occur in closed basins with no external drainage in dry desert regions where evaporation rates
exceed surface and groundwater recharge rates. Evapo-concentration of surface water and groundwater
in these basins results in the concentration of dissolved salts that eventually develop saline brines. Two
types of salars are classified by Houston et al. (2011) 11:(1) mature, halite dominant, and (2) immature,
clastic dominant. Kachi appears to be transitioning from an immature, clastic dominated salar, to a more
mature system with the beginning formation of a surficial salt layer with halite that extends to several
meters in depth.
The salar sediments are predominantly intercalated sands and clayey silts (Figure 5), which constitute a
leaky aquifer, with the entire sequence of sediments potentially contributing brine flow to wells. Higher
brine flows are obtained from intervals with high sand content and higher permeability, with the brine
grades generally comparable between geological units. The salar is surrounded on all sides by alluvial
and aeolian fans of varying dimensions and significance. Most important are the Western Fan Complex
and the South Fan (Figure 5) that intercept coarse-grained sediments that contain lithium bearing brines.
The North Fan is also important due to the presence of both coarse-grained sediments containing lithium
bearing brines and a substantial freshwater aquifer. This freshwater overlies the lithium bearing brine.
Figure 5. Conceptual hydrogeologic section through the Kachi Project, looking towards the northeast.
11
Houston, J., Butcher, A., Ehren, P., Evans, K., and L. Godfrey. The Evaluation of Brine Prospects and the Requirement for
Modifications to Filing Standards. Economic Geology, v. 106, pp. 1225–1239
11
MINERAL RESOURCE
An updated resource estimate was released in November 2023 12 and was based on the substantial
hydrogeological characterization since the last update in June 2023 13.This update provided refined
interpretations of the hydrostratigraphy, hydrogeology, and hydrogeochemistry. For details of the Mineral
Resource estimate, readers are referred to the November 22, 2023 ASX announcement and the detailed
report included in the Appendix 14 of that announcement. A summary of the Mineral Resource is provided
in Table 2 and details of the Mineral Resource classifications are presented in Table 3. A plan view map
of the Mineral Resource classifications is provided for 0 to 400 m bgs (Figure 6) and 400 to 600 m bgs
(Figure 7), and in 3-dimensions (Figure 8).
Table 2. Kachi Project Mineral Resource Summary 15
Resource Category
Lithium (Tonnes)
LCE (Tonnes)
Measured (M)
571,000
3,035,000
Indicated (I)
800,000
4,258,000
M&I
1,371,000
7,293,000
Inferred
630,000
3,352,000
Total Resource
2,001,000
10,645,000
12
See LKE ASX Announcement dated 22 November 2023
13
See LKE ASX Announcement dated 16 August 2023 t
14
Groundwater Exploration Services, 2023, Kachi Resource Estimate Detailed Report. Attachment to November 22 2023 ASX Lake
Resources Announcement.
15
Consider notes and details in Table 3 Updated Resource Estimate of Contained Lithium
12
Figure 7 Plan view map of the Indicated Resources (rose), with the surrounding area of Inferred Resource
(orange) at a depth of 400 – 600 m
13
Figure 8. Resource Classifications, looking north through the Resource area.
14
Table 3 Updated resource estimate of contained lithium
Measured November 2023 (to 400 m depth)
Unit
Sediment
Volume m3
Specific
Yield %
Brine volume
m3
Liters
Li
mg/L
Li grams
Li Tonnes
Tonnes LCE
A
11,001,000,000
0.078
858,078,000
858,078,000,000
210
179,783,644,000
180,000
956,000
B
4,366,100,000
0.081
352,090000
352,090,162,000
229
80,628,647,000
81,000
429,000
C
8,007,400,000
0.068
544,503,000
544,503,200,000
230
125,427,401,000
125,000
667,000
Fan West
8,833,000,000
0.095
839,135,000
839,135,000,000
220
184,609,700,000
185,000
982,000
Total
32,207,500,000
-
2,593,806,000
2,593,806,362,000
-
570,449,393,000
571,000
3,035,000
Indicated November 2023 to 600 m
Unit
Sediment
Volume m3
Specific
Yield %
Brine volume
m3
Liters
Li
mg/L
Li grams
Li Tonnes
Tonnes LCE
A (South)
3,694,300,000
0.076
278,924,000
278,924,452,000
181
50,485,326,000
50,000
269,000
B (South)
1,489,000,000
0.075
111,543,000
111,543,670,000
179
19,959,624,000
20,000
106,000
C (South)
4,382,400,000
0.067
294,407,000
294,407,879,000
182
53,582,234,000
54,000
285,000
A (North)
3,075,200,000
0.095
292,144,000
292,144,000,000
232
67,891,052,000
68,000
361,000
B (North)
4,294,400,000
0.095
407,968,000
407,968,000,000
241
98,166,484,000
98,000
522,000
C (North)
9,188,400,000
0.092
845,333,000
845,332,800,000
182
206,021,447,000
206,000
1,096,000
400 – 600m
12,230,170,000
0.066
806,922,000
806,922,156,000
242
195,275,162,000
195,000
1,039,000
400 – 600m
4,858,200,000
0.092
446,954,000
446,954,400,000
244
109,056,874,000
109,000
580,000
Total
43,212,070,000
3,484,197,000
3,484,197,358,000
800,438,203,000
800,000
4,258,000
1,370,887,596,000
1,371,000
7,293,000
Under Salar
West Fan Deep
Combined Measured and Indicated
75,419,570,000
6,078,004,000
6,078,003,721,000
Inferred November 2023
Unit
Sediment
Volume m3
Specific
Yield %
Brine volume
m3
Liters
Li
mg/L
Li grams
Li Tonnes
Tonnes LCE
A
4,756,500,000
0.080
378,325,000
378,325,351,000
185
69,975,435,000
70,000
372,000
B
1,671,300,000
0.079
131,198,000
131,197,886,000
191
25,101,960,000
25,000
134,000
C
5,287,600,000
0.074
393,746,000
393,746,422,000
218
85,950,119,000
86,000
457,000
Fan North
8,895,490,000
0.081
716,324,000
716,324,455,000
232
166,081,974,000
166,000
884,000
Fan South
12,248,490,000
0.064
781,249,000
781,249,112,000
239
186,718,538,000
187,000
993,000
Under volcano
6,718,700,000
0.074
500,471,000
500,471,260,000
192
96,334,211,000
96,000
512,000
Total
39,578,080,000
2,901,314,000
2,901,314,485,000
630,162,237,000
630,000
3,352,000
15
JORC definitions were followed for Mineral resources.
The Competent Person for this Mineral Resource estimate is Andrew Fulton, MAIG.
No internal cut-off concentration has been applied to the resource estimate. The resource is reported
at a 150 mg/L cut-off.
Some numbers do not add due to rounding.
Specific Yield (Sy) = Drainable Porosity.
Lithium is converted to lithium carbonate (Li2CO3) with a conversion factor of 5.32. For details on the
lithology units please refer to the June 15, 2023, August 22, 2023, and October 4, 2023 ASX
announcements.
Ore Reserve Estimation
An ‘Ore Reserve’ is the economically mineable part of a Measured and/or Indicated Mineral Resource. It
includes diluting materials and allowances for losses, which may occur when the material is mined or
extracted and is defined by studies at Pre-Feasibility or Feasibility level as appropriate that include
application of Modifying Factors. Such studies demonstrate that, at the time of reporting, extraction could
reasonably be justified 16.
The methodology used to develop estimates of the Mineral Resource Is different from the method used to
develop estimates of the brine Ore Reserve. The block (LeapFrog) model, which considers static
conditions, is used in estimating the Mineral Resource but cannot estimate the (fluid) brine reserve. The
Ore Reserve estimate is based on extraction of the brine that is transmitted in the subsurface in response
to well field pumping. As a result, a calibrated hydrogeological model (simulating flow and solute
transport) is the most appropriate tool to estimate the brine Ore Reserve through time. This model is
described below.
Numerical Hydrogeological Model Development
A numerical hydrogeologic model (“Model”) has been developed by a collaboration between consultants
(Watershed HydroGeo and GES) and the Lake Resources technical team. The Model is a fundamental
tool for understanding the hydrogeological system, simulating the brine extraction, and providing
quantified estimates of hydrogeological system behaviour as a result of that extraction. Additionally, given
that DLE is proposed at Kachi, the spent brine will be returned to the hydrogeologic system in
approximately the same proportions that the brine is pumped out of the system. This dynamic interaction
of lithium brine extraction with concurrent injection of spent brine is simulated in the Model.
The overall Model objectives for the Project are to:
Evaluate various extraction and injection well field layouts and designs to determine which options are
preferred for efficient and effective operations.
Verify that planned extraction and injection well designs and the mine plan meet production and
injection targets.
Quantify lithium mass through LoM for the proposed well field.
The JORC Code 2012 Edition. Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.
Effective 20 December 2012. Prepared by the Joint Ore Reserves Committee of The Australasian Institute of Mining and Metallurgy,
Australian Institute of Geoscientists and Minerals Council of Australia (JORC)
16
16
Evaluate the effects of spent brine injection and/or natural processes (i.e., capturing of lower
concentration lithium brine and/or freshwater dilution) on recovered lithium grades and mass through
LoM.
Provide a means for testing various injection well field design scenarios to determine optimal solutions
related to minimizing lithium grade dilution and extraction-related effects in environmentally sensitive
areas.
Provide estimates to inform Lake Resources of the likely changes to the hydrogeologic system that
may result from operation of the extraction and injection well fields from Year 1 to Year 25 including:
drawdown in the production horizons and at the phreatic surface;
changes to baseline fluxes and total dissolved solids in sectors of environmental
significance; and
evaluate post-closure conditions and recovery of the hydrogeologic system.
Simulate proposed freshwater wells for raw water supply to evaluate whether design yields can be
achieved and predict how water use during operations may impact freshwater quantity or quality, if at
all.
This model assessment has been undertaken with consideration of the Australian Groundwater Modelling
Guidelines (“AGMG”) 17. The AGMG was adopted throughout the groundwater industry as a benchmark for
best practice.
Model design
Modelling software
For the modelling presented here, the public domain numerical groundwater modelling software
MODFLOW-USG-Transport 18 v2.02.1 was used. This is an advanced version of the industry-standard
MODFLOW-USG code 19 that was originally developed (and is still supported) by the United States
Geological Survey (USGS).
Pre-processing and some of the post-processing of model inputs and outputs were carried out via the
Groundwater Vistas 20 (v8) graphical user interface, along with executables from the PEST suite 21 of
Groundwater Utilities.
The SMS numerical solver was used with head closure criteria 0.01 m and a tighter criteria of 1x10-7 m
was used for inner iterations to minimize flow and solute transport mass balance errors.
Barnett B, Townley LR, Post V, Evans RE, Hunt RJ, Peeters L, Richardson S, Werner AD, Knapton A and Boronkay A., 2012.
Australian Groundwater Modelling Guidelines. National Water Commission
17
Panday, S. 2023. MODFLOW-USG-Transport (v2.2.1). GSI. Available at: http:// http://www.gsi-net.com/en/software/freesoftware/USG-Transport.html
18
Panday S, Langevin C, Niswonger N, Ibaraki M, and Hughes J.2013. Chapter A45: MODFLOW-USG Version 1: An unstructured
grid version of MODFLOW for simulating groundwater flow and tightly coupled processes using a control volume finite-difference
formulation. U.S. Geological Survey Techniques and Methods, Book 6, 66
19
20
ESI, 2020. Groundwater Vistas (v8). https://www.groundwatermodels.com/ESI_Software.php
Doherty, J. (2010). Pest: Model-independent parameter estimation, user manual. In Watermark Numerical Computing (5th ed.).
PEST Manual. and Doherty, J. (2015). Calibration and uncertainty analysis for complex environmental models. Brisbane, Australia:
Watermark Numerical Computing
21
17
Model variants
Three versions of the Model were developed for different purposes. All three have consistent model
domain or extent, consistent layer geometry, and consistent boundary conditions, other than time variant
boundaries. These three models are:
catchment-processes model (longer term historical /calibration model to capture basin scale
processes and laguna fluctuations);
pumping-test model (short-term, local scale calibration model focused on the salar); and
predictive model (for forecasting mine operations).
The reason for the first two is to focus on longer-term seasonal or annual processes and have a separate
model that employs a higher temporal resolution to focus on two pumping and injection tests carried out
by Lake in mid-2023.
Solute transport and density-dependent flow
All model variants simulate two solute transport species (total dissolved solids, TDS and Lithium, Li).
They simulate density-dependent f
Share your feedback
Discover