Annual Report to shareholders
Released
Released
Announcement PDF
Annual
Report
2024
lakeresources.com.au
LAKE RESOURCES ANNUAL REPORT 2024
b
CORPORATE DIRECTORY
Directors
Stuart Crow
Non-Executive Chairman
David Dickson
Managing Director/CEO
Robert Trzebski
Non-Executive Director
Management
Don Miller
Chief Financial Officer
Justin Olson
Chief Legal, Compliance & Risk
Officer and General Counsel
Mark Anning
Head of Legal, Australia and
Company Secretary
Principal Registered Office and
Principal Place of Business
Level
5, 126 Phillip Street
Sydney NSW 2000
Tel: +61 2 9299 9690
Share registry
utomic Pty Ltd
A
GPO Box 5193
Sydney, NSW, 2001
Tel: +61 2 9698 5414
Auditor
BDO Audit Pty Ltd
Level 10, 12 Creek Street
Brisbane Qld 4000
Solicitors
hite & Case
W
Level 32
525 Collins Street
Melbourne VIC 3000
Australia
Bankers
Citibank, N.A., Sydney
Stock exchange listings
ustralian Securities Exchange
A
(ASX code: LKE)
OTCQB: LLKKF
Website address
www.lakeresources.com.au
Amalia Sáenz
Senior Vice President, Corporate
Affairs and Country Manager,
Argentina
1
LAKE RESOURCES ANNUAL REPORT 2024
FY2024
HIGHLIGHTS
Successful lithium
carbonate testing, one of
the largest test programs
undertaken by a DLE project
Maiden Ore Reserve
demonstrates
Kachi project capable
of delivering
25
ktpa operation
US$2.3B
2
Production
Environmental
Impact Assessment
submitted for Phase
One of Kachi project
Kachi Phase One Definitive
Feasibility Study shows post-tax
NPV of US$2.3B and IRR of 21%
CONTENTS
Message from the CEO
5
Message from the Chair
8
Review of Operations
10
Directors’ Report
17
Auditor’s Independence
Declaration
55
Consolidated Statement
of Profit or Loss and other
Comprehensive Income
56
Directors’ Declaration
116
Consolidated Statement
of Financial Position
57
Consolidated Statement
of Changes in Equity
58
Consolidated Statement
of Cash Flows
2024 Corporate
Governance Statement
121
60
Additional ASX Information
138
Notes to the Consolidated
Financial Statements
61
Resource Estimates
and Governance
142
Schedule of Tenements
143
Consolidated Entity
Disclosure Statement
LOI signed with
Argentine energy
infrastructure
company for
Kachi power
supply
Post-balance date:
Lilac Solutions
identifies cost savings
of up to 50% for
DLE equipment and
confirms long-term
lithium recovery rates
of over 90%
Independent Auditor’s Report 117
115
Kachi Phase One
Definitive Feasibility
Study outlines clear
path to 25ktpa battery
grade lithium carbonate
production with
expansion possibilities
subject to further study
Lake cuts global
headcount by additional
50%; strategic partnering
process continues; noncore asset sale process
underway for Paso de
Jama, Olaroz, Cauchari
and Ancasti projects
3
LAKE RESOURCES ANNUAL REPORT 2024
ABOUT LAKE RESOURCES
Lake Resources NL (ASX:LKE; OTC:LLKKF)
is a responsible lithium developer utilising
state-of-the-art ion exchange extraction
technology for production of sustainable, high
purity lithium from its flagship Kachi Project
in Catamarca Province within the Lithium
Triangle in Argentina.
This ion exchange extraction
technology delivers a solution
for two rising demands – high
purity battery materials to
avoid performance issues, and
more sustainable, responsiblysourced materials with a
low carbon footprint and
significant ESG benefits.
Decarbonisation will continue
to drive significant lithium
demand growth through the
rapid adoption of renewable
electricity generation and
electric vehicles. Lake is
building its business to
meet the growing demand
for high-quality lithium
needed to meet the world’s
decarbonisation ambitions.
INNOVATIVE TECHNOLOGY
PRODUCING
HIGH‑PURITY LITHIUM
Lake’s technology partner,
California-based Lilac Solutions
Inc, has developed efficient and
disruptive clean technology to
produce sustainable high purity
lithium. This approach comes
with a small environmental
footprint, both physically and
by returning almost all brine to
its source.
Lilac and Lake are working
together to set a new standard
for project development in
the lithium industry. The
demonstration plant has
proven highly successful –
independent testing of lithium
carbonate produced from the
Kachi Project in Argentina has
confirmed grades and purity
greater than 99.8%.
4
This is a proven and more
efficient way to refine and
produce battery-grade lithium
carbonate. The ion exchange
technology produces a lithiumrich solution without long
lead-time and environmentally
disruptive evaporation pond
concentration – allowing Lake
to produce high-quality lithium
sustainably and at scale.
Lilac and Lake are strategically
aligned through a 25% project
earn-in on the completion
of technology testing,
demonstration plant validation
and end-product qualification.
On 19 December 2023, Lake
Resources announced the
results of its Definitive
Feasibility Study (DFS) for
phase one of the globally
significant Kachi lithium
brine project in Argentina. The
Kachi Project Phase One DFS
demonstrates that Kachi is
a top tier project, backed by
a significant resource and
strong economics positioning
it competitively within the
growing lithium market.
LOCATED IN ARGENTINA’S
LITHIUM TRIANGLE
Lake’s flagship Kachi Project
is in Catamarca Province
within the Lithium Triangle in
Argentina, one of the world’s
key lithium regions – half of all
global lithium resources are
found in the Lithium Triangle.
Lake also has three additional
early-stage projects in
this region.
MESSAGE FROM THE CEO
To my fellow shareholders,
I am pleased to present Lake Resources’ FY24 Annual Report.
Lake has had a significant year operationally, against a
backdrop of challenges facing the broader lithium sector.
I am grateful to our staff and everyone associated with
Lake for remaining steadfast in their determination to
build a better Company, despite facing extremely difficult
market conditions.
Our focus during this time has been, and will continue to be,
on those things we can control, to ensure our Company is in
the best possible position to benefit from the eventual upturn.
The work done this past year has been very important in this
regard, laying the groundwork for our future growth.
DFS shows Kachi a top tier project
Released in December 2023, the Kachi project’s Phase One
Definitive Feasibility Study (DFS) demonstrated that Kachi
is a tier one project, backed by a significant resource and
strong economics that position it competitively within the
lithium market.
The financial highlights included a post-tax net present value
(NPV) of US$2.3 billion and an internal rate of return (IRR)
of 21%, with annual average EBITDA of US$635 million and
an EBITDA margin of 76%. It would generate US$21 billion in
revenue and US$16 billion in EBITDA for Phase One, making it a
very attractive project.
Importantly for our broader stakeholders, Kachi will advance
sustainable and responsible lithium production through the
application of ion exchange Direct Lithium Extraction (DLE)
technology from our partner, Lilac Solutions.
The Phase One DFS has marked a key milestone in Kachi’s
development, building on the field, test and engineering work
performed over more than two years and representing a credible
and de-risked execution plan to support delivery of the project.
Released in conjunction with the DFS, Lake also announced
a maiden Ore Reserve for Kachi which demonstrated that the
mine plan is capable of delivering sufficient lithium brine for a
planned 25 ktpa operation.
Significantly, the feed grade will average above 245 mg/L with
minimal dilution, ensuring the operation can be developed in
an environmentally sustainable manner. The Ore Reserve for
the 25 ktpa operation extracts only a small percentage of the
Mineral Resource Estimate.
Prior to the release of the DFS, in August 2023 Lake further
de-risked the DLE process following successful extraction
and injection tests at Kachi. The testing confirmed highly
favourable reservoir hydraulic properties at Kachi, allowing
Lake to optimise the future wellfield.
A month later, Lake announced the successful completion of
a lithium carbonate test program, producing battery-grade
lithium carbonate from Lilac DLE chloride eluate. These tests
further proved the extraction technology, reinforcing Lake’s
great confidence in the DLE process.
And in November 2023, Lake reported another success with
Kachi’s Measured and Indicated Resources increasing from
2.9 to 7.3 Mt LCE, with the total resource estimate exceeding
10.6 Mt LCE. These results highlight the continued resource
growth at Kachi since the maiden resource estimate was
announced in November 2018.
Strategic refresh
Lake started calendar year 2024 in a strong position
following the successful Kachi DFS. However, the lithium
market environment continued to worsen, requiring Lake
management to rapidly adapt in order to preserve shareholder
capital, extend its financial runway and ensure the
advancement of value-adding activities.
In March 2024, Lake announced a number of actions aimed at
“right-sizing” the Company, including a substantial reduction
in global headcount and other cost-saving initiatives. While
these measures are never easy, they were necessary to
ensure Lake preserves its financial flexibility amid difficult
market conditions.
Lake is also actively engaging with a number of potential
strategic partners with the goal of securing a strategic equity
partner for Kachi’s development.
Concerning the project, there have also been a number
of other milestones achieved during 2024, including
the submission of a Production Environmental Impact
Assessment (EIA) for Phase One of the Kachi project
to the Catamarca Ministry of Mining in Catamarca
Province, Argentina.
5
LAKE RESOURCES ANNUAL REPORT 2024
This demonstrates that Lake has given due attention to
Kachi’s impacts on the environment and local community.
Importantly, the EIA shows that Lake’s innovative and
sustainable project development plan will have a small water
footprint, amongst the lowest for lithium brine projects per
tonne, compared to evaporation ponds or absorption DLE
technology. Other environmental benefits for Kachi include its
small land footprint and low solid waste output compared to
traditional evaporation ponds and hard rock projects.
Lake continues to put priority on caring for the environment
and collaborating with the local community. We look forward
to bringing future employment and economic growth
to Catamarca Province, while contributing to the global
energy transition.
In another important operational update, Lake signed in May
2024 a ‘Letter of Intent’ (LOI) with YPF Luz, a leading Argentine
sustainable electric power generation company. Under the LOI,
Lake and YPF Luz are engaging in discussions regarding the
construction of a high voltage power line to Kachi and delivery
of the power supply necessary for the Kachi project.
Establishing a power solution for Kachi is a critical milestone
for the project’s development. Importantly, YPF Luz has
demonstrated expertise in bringing power to remote areas of
Argentina and shares Lake’s commitment to sustainability.
Post-balance date, on July 1, Lake announced further cost
reductions along with the exploration of a possible sale of
non-core assets and lithium tenements located in Jujuy
and Catamarca Provinces, namely the Paso de Jama, Olaroz,
Cauchari and Ancasti projects. Given that Kachi is Lake’s
flagship project, the timing is right for marketing the sale of
these assets to optimise the Company’s financial runway.
6
Significantly, on July 19, Lake welcomed the release of Lilac’s
fourth-generation ion exchange technology and technical
white paper. The white paper showed Lilac has improved longterm lithium recovery to over 90% on salar brines and reduced
core extraction equipment cost by up to 50%, resulting in
total cost savings across the DLE technology of up to 25%.
In addition, 10% lower reagent consumption is expected to
positively impact project operating costs.
These are substantial savings which we expect to enhance
Kachi’s economics, potentially reducing the overall capex
requirement by up to 10%. We look forward to working with
Lilac to implement these improvements at Kachi, delivering a
more cost-competitive project for the benefit of shareholders.
Finally, my enormous thanks to Lake directors, employees,
contractors and everyone involved with our Company after
what has been an enormously challenging year.
Despite recent difficulties, the longer-term outlook is
extremely positive for Lake and the lithium sector. I
hope you will stay with us for the journey as we work to
deliver responsible lithium supply to facilitate the world’s
energy transition.
David Dickson
Managing Director & CEO
7
LAKE RESOURCES ANNUAL REPORT 2024
MESSAGE FROM THE CHAIR
To my fellow shareholders,
Thank you for your support in what has been a year of
substantial progress at Lake.
In the short term, lithium is in a bear market, with prices
having fallen significantly and new projects and investments
being curtailed as a result. Ultimately though, we believe
that the market will rebalance, with the long-term structural
thematic underpinning lithium demand remaining intact.
For example, based on today’s policy settings, almost one in
three cars on the road in China by 2030 will be electric, and
almost one in five in both the United States and the European
Union, according to the International Energy Agency.
Industry analysts, Benchmark Mineral Intelligence, project
that the lithium market needs US$94 billion of investment
simply to meet the anticipated 2030 demand, and double that
to meet 2040 demand.
Lithium demand is expected to double by 2026 and triple
by 2030 from 2023 levels, presenting a compelling case for
investment. Importantly, the lengthy lead times in developing
new projects and recent curtailments could lead to lithium
raw material deficits emerging from 2028 and extending to
around 1.8 million tonnes LCE by 2040.
In short, the world needs 100 Kachi Phase One projects to
balance the market by 2030.
Argentina holds 12% of global lithium reserves and is currently
the world’s fourth-largest lithium producer, having some of the
largest and most productive lithium deposits in the world. The
recent passage of the ‘Incentive Regime for Large Investments’
has enhanced Argentina’s attractiveness as a recipient of
foreign investment, with the current administration showing a
positive stance towards the mining and lithium sector.
The United States and Argentina are continuing discussions on
facilitating greater bilateral trade and investment; talks which
Lake welcomes. Through these talks, we are optimistic that a
pathway will be found to facilitate greater Argentinian lithium
supply into U.S. battery production, with potential access to U.S.
‘Inflation Reduction Act’ subsidies.
It is therefore important for Lake to continue advancing our
flagship project while preserving shareholder capital, ensuring
that your Company is ready to seize the opportunities that will
emerge from the projected supply deficit.
In this regard, I would like to thank Lake shareholders for
supporting our Share Purchase Plan and welcome all new
investors who have participated in recent equity raisings.
8
It has also been refreshing to meet Lake shareholders during
our recent investor briefings in Australia, to get first-hand
feedback. All of the shareholder sessions we have held have
been well attended, which is extremely encouraging, while
we also continue to receive a positive response from many
stockbrokers and fund managers.
With the benefit of recent cost-cutting initiatives, including
the significant reduction in global headcount, Lake has
trimmed expenditures enormously, with consumption of cash
reserves to reduce further through the second half of 2024.
The potential sale of non-core assets in Argentina will
also strengthen Lake’s financial position as we focus on
our flagship Kachi project and its development, including
securing a strategic partner.
Lake also sees significant potential for enhancing capex and
opex efficiencies between now and the start of production,
with a number of optimisation opportunities identified.
Adjusting to market conditions has required tough decisions
by your Board. I would like to sincerely thank our former NonExecutive Directors, Howard Atkins, Dr Cheemin Bo-Linn and
Ana Gomez Chapman, who all, further enabling the Company
to adjust to market conditions, voluntarily resigned in July
2024 after making significant contributions to Lake.
Looking ahead, Lake is continuing to advance the strategic
partnering process for Kachi. We are focused on ensuring the
process maximises Kachi’s value, with a competitive strategic
partnering process to secure equity investment and offtake
agreements. Because of the current lithium market conditions,
we expect that the strategic partnering process will take longer
than initially expected. The successful Kachi DFS has shown
the value of our flagship project, and I am confident we will
secure the right partner to drive our development journey.
In this regard, our technology partner, Lilac’s recent progress
has been extremely encouraging, positioning its DLE
technology as a leader in the field.
An ESG-friendly, sustainable production solution is essential
for the communities where we operate together with global
investors and industry players, and this is exactly what
Lilac’s technology will help deliver with its higher lithium
recovery rates, lower water and land usage and reduced solid
waste volume.
Lake also continues to build strong relationships with all
levels of government in Argentina together with the local
community and other stakeholders, ensuring we maintain a
social licence to operate.
Kachi’s development will deliver better infrastructure and
significant employment and economic opportunities for the
local community and we are working diligently to maximise
the local benefits. Lake has continued to engage with the
community, holding a number of public information sessions,
while promoting training and other job opportunities as well
as ensuring the health and safety of our workforce.
As an investor it is important to evaluate any company on
its merits. I believe Lake continues to offer a compelling
opportunity, due to its robust market and project
fundamentals; a globally significant resource and proven,
sustainable production; and compelling project economics,
with opportunities for further optimisation.
The security of future lithium supply is virtually impossible
without Argentina. Lake is in the right place at the right time
with the right product for the global decarbonisation drive.
Thank you again for your support and I look forward to meeting
you during Lake’s shareholder meetings in Australia.
Stuart Crow
Non-Executive Chairman
9
LAKE RESOURCES ANNUAL REPORT 2024
REVIEW OF OPERATIONS
Kachi Project
It was an exciting year at Lake’s flagship Kachi Project in
Catamarca. The JORC-compliant total mineral resource
estimate grew significantly during fiscal 2024 to more than
10.6 million tonnes (Mt) of contained battery grade lithium
carbonate equivalent (LCE), with 7.3 Mt of LCE in the Measured
and Indicated Resource category. Additionally, significant
project milestones were achieved, including:
August 2023 – Successful extraction and injection tests.
September 2023 – Completion of lithium carbonate tests
by Saltworks Technologies.
November 2023 - Updated JORC Mineral Resource Estimate.
December 2023 – Maiden JORC Ore Reserve Statement.
December 2023 - Phase One Definitive Feasibility Study
(DFS) for the planned 25-year 25,000 tonnes per annum
(tpa) LCE operation.
March 2024 – Submission of the Production Environmental
Impact Assessment (Informe de Impacto Ambiental Etapa de Explotación - Proyecto Kachi).
Successful field operations and subsurface characterisation
programs provided the expansive data set that underpinned
these studies. The FY2024 field program was a continuation
of the field program completed in FY2023, and included three
drillholes and three pumping and injection tests on wells
drilled in the previous fiscal year.
Highlights included:
Three drillholes completed to over 600m; all confirmed the
presence of lithium brine in sediments similar to those
encountered to 400m depth (Figure 1).
The footprint of the lithium brine extent grew dramatically
to the north and south, as well as vertically.
10
Higher grade lithium concentrations measured in the
southern sector at K24D41 and K25D44 (Figure 2) returning
grades of 180-348 mg/L lithium over 445m (166 – 610m) with
an average of 267 mg/L and 230 - 302 mg/L lithium over
407m (215 – 622m) with an average of 257 mg/L, respectively.
Northern step-out hole K23D40 intersected coarsegrained alluvial fan materials and averaged 228 mg/L over
322m with a maximum of 254 mg/L. This hole is 3.5 km
northwest of K22R39.
The consistency of the lithium concentration and brine
chemistry in the new step out holes demonstrated how
well the brine has circulated and mixed within the basin.
Additional data from pumping tests and infill drilling has
led to improved lithium grades in the central resource area.
Extraction and injection tests confirmed highly favourable
subsurface conditions (Figure 1) for both lithium extraction
and injection in the central resource area where the
Measured and Indicated Resources are located (refer ASX
announcement 16 August 2023).
Lithium carbonate tests conducted by Saltworks
Technologies in Canada, producing battery-grade lithium
carbonate from Lilac DLE lithium chloride eluate (refer ASX
announcement 26 September 2023).
Mineral Resource Estimate
Lake’s concession holdings are expansive and cover an area of
more than 103,000 Ha. The updated JORC-compliant resource
estimate for the Kachi Project from November 2023 comprised
7.3 Mt LCE as Measured and Indicated Resource and 3.3 Mt LCE
as Inferred Resource (Figure 2&3 and Table 1).
Step-out holes and deeper drilling to 600m bgs (metres
below ground surface) led to significantly larger resource
estimates than previous mineral resource updates.
Measured and Indicated Resources increased from 2.9
to 7.3 Mt of LCE defined to a depth of 600m over 143.8
square kilometres.
Surrounding the Measured and Indicated Resources are
Inferred Resources of approximately 3.3 Mt LCE defined
over 130.9 sq km.
The updated total resource estimate exceeds 10.6 Mt
of LCE.
Simulations indicated that the well-field design can
exceed processing plant design capacity, with potential
unconstrained potential for LCE production of 834,000
tonnes relative to the reserve’s 624,400 tonnes.
Plant design capacity is the constraint for LCE production.
Significant exploration targets remain and are estimated
to contain between 3.6 Mt and 14.7 Mt LCE.
Feed grade in Years 1-7 of operations is predicted to
be 257 mg/L.
The Kachi Mineral Resource Estimate has steadily grown in
size since the maiden resource in 2018, adding more than
2 Mt LCE since 2023 (Figure 3 and Table 2).
Feed grade in Years 8-25 of operations averages 245 mg/L.
Ore Reserves Statement
The extensive characterisation data set, inclusive of geologic,
hydrogeologic, hydrochemical, and geophysical data formed
the basis for the conceptual and numerical models that are
the basis for the Ore Reserve estimate and Environmental
Impact Study.
Dilution as a result of injection of spent brine on the
western and eastern margins of the well-field is minimal
(less than 10% after 25-years of operations).
Production in Years 1-7 is predicted to be 94% from
Measured Resources with the remainder from
Indicated Resources.
Production in Years 7-25 is predicted to be 85% from
Measured Resource with 9% from Indicated Resources.
The JORC-compliant Ore Reserve Statement included the
following key findings:
Significant upside exists for larger production rates
with total reserves representing less than 6% of the
total resource.
Modelling of the well-field development plan indicated the
planned mine design will result in feed grades and rates
in excess of those required to produce 25,000 tpa LCE over
the Life-Of-Mine (LoM).
Modelling indicates that the planned operation results in
minimal changes to the hydrogeologic system, including
environmentally sensitive areas.
Ore Reserves (Table 3) were classified into Proved and
Probable Reserves based on industry standards, the
Competent Person’s experience, and confidence in data
and hydrogeologic model performance.
Phase One Definitive Feasibility Study
The hydrogeologic model reproduced historical data very
well, which improves the predictive reliability of the model
simulations related to lithium recovery and injection.
A post-tax NPV8 of US$2.3 billion and an internal rate of
return (IRR) of 21%.
Proved Reserves were specified for the first seven years
despite very high production from the Measured Resource.
Probable Reserves were conservatively assigned for the
last 18 years of the LoM, as model reliability is expected to
continue to improve with operational data.
The well-field development plan includes 16 extraction
wells and 21 injection wells, with extraction focused on the
core of the salar where lithium concentration is highest.
A major milestone for the Kachi Project was the release of the
Phase One DFS. Highlights included:
Targets battery grade lithium carbonate revenue of US$21
billion and US$16 billion EBITDA for the 25-year LoM.
Targets annual average EBITDA of US$635 million and
EBITDA margin of 76%.
US $6.05 / kg of LCE estimated run rate Opex for Phase One.
25-year mine life supported by maiden Ore
Reserve statement.
Phase One targets production of 25 ktpa over the LoM.
11
LAKE RESOURCES ANNUAL REPORT 2024
DLE process tailored to mitigate impact on the local
community with minimal disruption to land, freshwater
table, and water usage.
The Project targets production of consistent battery grade
lithium carbonate (>99.5% purity) at site without the need
for further refining or processing.
Proven process from brine extraction to battery grade
lithium carbonate.
The Project operated two campaigns at the demonstration
plant processing 5.2 million litres of brine and producing
over 200,000 litres of lithium chloride eluate while
also allowing for increased operational experience and
optimisation of Lilac’s DLE technology.
Additionally, the Project has produced in excess of 1,300
kilograms of >99.5% purity lithium carbonate at Saltworks’
demonstration facility to ensure that the commercial
flowsheet will meet expectations and to have in place
product samples for potential offtake parties.
Utilising Lilac’s proprietary ion-exchange DLE technology
eliminates the need for upstream or downstream
evaporation ponds for lithium concentration, reducing the
footprint of a traditional brine evaporation operation by >90%.
The demonstration plant vessels, which hold the ionexchange material, are approximately one-third the size
of commercial-scale vessels. This significantly reduces
scale-up risk and increases process uptime.
The extraction plant is conservatively designed for 80%
lithium recovery within the DLE process and an overall
plant recovery of lithium of >75%.
Production Environmental Impact Assessment
A comprehensive Environmental Impact Assessment (EIA)
for production activities was submitted in March 2024.
The EIA was prepared by global mining and environmental
consultancy Knight Piesold with technical support from
additional subject matter experts in groundwater modelling
and Lake’s technical team.
As part of the review process, the lead review agency, the
Ministry of Mining of Catamarca, held a two-day presentation
in July 2024 of the EIA led by global consulting firm Knight
Piesold and Lake Resources’ technical teams. The meeting
was attended by several government agencies participating in
the EIA process, including the Provincial Directorate of Mining
Environmental Management, Provincial Directorate of Social
Promotion and Corporate Social Responsibility, Secretariat of
Water Resources, Secretariat of Environment, Secretariat of
Energy, Secretariat of Indigenous Affairs, Provincial Directorate
of Archaeology and Palaeontology, and municipal authorities.
As part of the meeting, Lake shared the highly advanced brine
management plans, which have been developed to maintain
baseline hydrogeological conditions by reinjecting spent
brine and hence preserve environmentally sensitive areas. The
project is designed with an industry-leading low freshwater
consumption of less than 24 cubic metres per tonne of LCE
over the course of the operation.
Front End Engineering Design (FEED)
YPF Luz has been advancing the FEED for the power delivery
system for the Kachi Project. As of August 2024, significant
progress has been achieved by YPF Luz including geotechnical
investigations of some key infrastructure sites. The
Environmental Impact Assessments for the Provinces of Salta
and Catamarca will be submitted by Q4 2024, and the FEED
Study is expected to be completed by the end of year.
Site Reclamation
As the project transitions from exploration to exploitation,
Lake has been carrying out the reclamation activities required
by the exploration permit. These efforts involve removing the
majority of the temporary camp’s infrastructure, regrading
and revegetation, and consolidating assets and offices into
the former DLE demonstration plant building. As part of this
process Lake has engaged with community members to
ensure that local input is integrated into current site plans
and the permanent camp configuration.
Figure 1: Hydrogeological east-west cross-section of the Carachi Pampa Basin, illustrating the sand and silt units that dominate the salar
area and coarser-grained materials of the alluvial fans west of the salar core. The thick sand horizons in the salar core are the focus of planned
production wells with injection wel