ASX ANNOUNCEMENT
4 August 2025
Kachi Project Definitive Feasibility Study
Addendum
Updated DFS results in material capital and
operating cost estimate reductions
Lake Resources N.L. (ASX: LKE; OTC: LLKKF) (“Lake” or the “Company”), announces the results of
its updated Kachi Project Definitive Feasibility Study (“DFS Addendum”) for Phase One of the globally
significant 25ktpa Kachi lithium brine project in Argentina (“Kachi”, “Kachi Project” or “Project”).
The DFS Addendum supplements the previously released Phase One DFS from December 2023 1
(“Original DFS”). This DFS Addendum confirms that Kachi is a tier one project, backed by a significant
resource with strong economics, positioning it competitively within the growing lithium market. The
DFS Addendum builds on the Original DFS and incorporates independently reviewed and verified
value engineering outcomes completed since the Original DFS was issued in December 2023.
DFS Addendum Highlights
Reduced CAPEX to US$1,157M – a ~US$220M (16%) improvement over the Original DFS
Reduced OPEX to $5,895/t LCE – a 3% improvement over the Original DFS – and still one of
the lowest on the industry cost curve
Further reductions in CAPEX and OPEX achievable if the plant design basis is upgraded
to ref lect 268 mg/L as shown in the Ore Reserve Update 2, as compared with the DFS
Addendum design basis of 249 mg/L
Estimated NPV10 of US$1,469M pre-tax and US$1,011M post-tax based on average price of
~$20,500/t 3 f or battery grade lithium carbonate
Estimated IRR at 22.5% pre-tax and 19.7% post-tax
Robust financials with high resilience to CAPEX and OPEX sensitivities
Reduced execution risk including design optimizations, critical de-risking of power supply,
and f inal Exploitation Environmental Impact Assessment (“EIA”) approval expected this year
1
Refer to ASX Announcement dated 19 December 2023 - “Kachi Phase One Definitive Feasibility Study”
Refer to ASX Announcement dated 4 August 2025 - “Kachi Updated Ore Reserve”
3
Based on BMI Q2 2025 Lithium Price Forecast available via annual paid subscription.
2
1
Updated Cost Estimate Drivers
Significantly improved brine grade compared with the Original DFS
Implementation of Lilac Solutions’ Generation 4 Ion Exchange technology improvements
and accompanying improved lithium recovery rates
Updated 2025 inflation-adjusted unit cost values
Refreshed high-quality resource 4 and reserve 5 data
Efficiencies in well development, construction and execution methodology
Rationalized construction and operating manpower plan
Reduced power demand and updated power supply cost estimates
“The long-term outlook f or lithium demand remains strong, with a supply def icit expected to emerge
later this decade. As one of the largest independent lithium development projects in Argentina, Kachi
will be an important asset in addressing this def icit,” said David Dickson, Lake’s CEO. “Kachi is a
signif icantly more attractive investment, conf irmed by the results of the DFS Addendum, which f urther
capitalizes on opportunities f or ef f iciencies identif ied in the Original DFS.”
Next Steps for the Kachi Project
Continue to advance the EIA approval process with the Catamarca Mining Authority, with
approval anticipated in the second half of 2025
Continue to progress the strategic alternatives process 6 to consider and assess multiple
strategic alternative options, including the sale of all or a part of Lake’s interest in Kachi, a
potential sale or merger of the Company, restructuring initiatives, or partnership or joint
venture structures
Remain f ocused on preserving Lake’s f inancial f lexibility by continuing to right-size its cost
structure and maintaining appropriate levels of liquidity
For investor queries, please contact:
InvestorRelations@lakereources.com.au or log onto Investor Hub through Lake’s public website.
Media Contact:
William Pretty, Teneo
M: +61 405 197 970
E: William.Pretty@teneo.com
About Lake Resources:
Lake Resources N.L. (ASX:LKE; OTC: LLKKF) is a responsible lithium developer utilising state-of-theart ion exchange extraction technology for production of sustainable, high purity lithium from its
flagship Kachi Project in Catamarca Province within the Lithium Triangle in Argentina.
This ion exchange extraction technology delivers a solution for two rising demands – high purity
battery materials to avoid performance issues, and more sustainable, responsibly sourced materials
with low carbon footprint and significant ESG benefits.
Forward Looking Statements:
Certain statements contained in this announcement, including information as to the future financial
performance of the projects, are forward-looking statements. Such forward-looking statements are
4 Refer to ASX Announcement dated 3 June 2025
5 Refer to ASX Announcement dated 4 August 2025 - “Kachi Updated Ore Reserve”
6 Refer to ASX Announcement dated 7 May 2025
2
necessarily based upon a number of estimates and assumptions that, while considered reasonable by
Lake Resources N.L. are inherently subject to significant technical, business, economic, competitive,
political and social uncertainties and contingencies; involve known and unknown risks and
uncertainties and other factors that could cause actual events or results to differ materially from
estimated or anticipated events or results, expressed or implied, reflected in such forward-looking
statements; and may include, among other things, statements regarding targets, estimates and
assumptions in respect of production and prices, operating costs and results, capital expenditures,
reserves and resources and anticipated flow rates, and are or may be based on assumptions and
estimates related to future technical, economic, market, political, social and other conditions and
affected by the risk of further changes in government regulations, policies or legislation and that
further funding may be required, but unavailable, for the ongoing development of Lake’s projects.
Lake Resources N.L. disclaims any intent or obligation to update any forward-looking statements,
whether as a result of new information, future events or results or otherwise. The words “believe”,
“expect”, “anticipate”, “indicate”, “contemplate”, “target”, “plan”, “intends”, “continue”, “budget”,
“estimate”, “may”, “will”, “schedule” and similar expressions identify forward-looking statements. All
forward-looking statements made in this announcement are qualified by the foregoing cautionary
statements. Investors are cautioned that forward-looking statements are not guarantees of future
performance and accordingly investors are cautioned not to put undue reliance on forward-looking
statements due to the inherent uncertainty therein. Lake does not undertake to update any forwardlooking information, except in accordance with applicable securities laws.
3
DFS Addendum Summary Report
The ASX Listing Rules contain a number of reporting obligations on mining production and exploration
activities, including, without limitation, requirements applicable to reports of mineral resources for
material mining projects (ASX Listing Rule 5.8), reports of ore reserves for material mining projects
(ASX Listing Rule 5.9), reports of production targets (ASX Listing Rule 5.16) and reports containing
forecast financial information derived from a production target (ASX Listing Rule 5.17).
This DFS Addendum Summary Report (“DFS Addendum” or “Report”) includes all required
information to comply with these rules. This information may be referred to and explained in a number
of the sections of this report; however, for ease of reference, the Company has listed in the tables
below the information required by these rules, and provided cross-references to the key sections of
this report which contain this information.
As this is a Report of changes and modifications to the Original DFS, certain of the information
contained in the Original DFS has not changed. This will be noted in this Report and the reader will
be referred to the information in the Original DFS.
4
Listing Rule 5.8
Item
DFS Addendum
Report Section(s)
Geological interpretation
Section 3
Sampling and sub-sampling techniques
Appendix 1
Drilling techniques
Appendix 1
The criteria used for classification, including drill and data spacing and distribution.
This includes separately identifying the drill spacing used to classify each category of
mineral resources (inferred, indicated and measured) where estimates for more than
one category of mineral resources are reported
Section 4 & Appendix 1
Sample analysis method
Appendix 1
Estimation methodology
Section 4 & Appendix 1
Cut-off grade(s) indicating the basis for the selected cut-off grade(s)
Section 4 & Appendix 1
Mining and metallurgical methods and parameters, and other material modifying
factors considered to date
Sections 5, 6, 7, 8 &
Appendix 1
Listing Rule 5.9
Item
DFS Addendum
Report Section(s)
Material assumptions and the outcomes from the preliminary feasibility study or
feasibility study (as the case may be). If the economic assumptions are commercially
sensitive to the mining entity, an explanation of the methodology used to determine
the assumptions rather than the actual figure can be reported
Section 14
The criteria used for classification, including the classification of the mineral
resources on which the ore reserves are based and the confidence in the modifying
factors applied
Section 4 & Appendix 1
The processing method selected and other processing assumptions, including the
recovery factors applied and the allowances made for deleterious elements
Section 8 & Appendix 1
The basis of the cut-off grade(s) or quality parameters applied
Section 4 & Appendix 1
Estimation methodology
Section 4 & Appendix 1
Material modifying factors, including the status of environmental approvals, mining
tenements and approvals, other governmental factors and infrastructure
requirements for selected mining methods and for transportation to market
Section 4 & Appendix 1
5
Listing Rule 5.16
Item
DFS Addendum
Report Section(s)
All material assumptions on which the production target is based. If the
economic assumptions are commercially sensitive to the mining entity,
an explanation of the methodology used to determine the assumptions
rather than the actual figure can be reported
Section 14
A statement that the estimated ore reserves and/or mineral resources
underpinning the production target has been prepared by a competent
person or persons in accordance with the requirements of the JORC
Code.
CP Statement & Appendix 1
The relevant proportions of:
•
Probable ore reserves and proved ore reserves;
•
Inferred mineral resources, indicated mineral resources
and measured mineral resources;
•
An exploration target; and
•
Qualifying foreign estimates,
Underpinning the production target.
The appropriate disclaimers if a proportion of the production target is
based on inferred mineral resources or an exploration targe, or if the
production target is based solely on inferred mineral resources.
Section 4 & Appendix 1
Not Applicable
Listing Rule 5.17
Item
DFS Addendum
Report Section(s)
All material assumptions on which the forecast financial information
is based. If the economic assumptions are commercially sensitive to
the mining entity, an explanation of the methodology used to
determine the assumptions rather than the actual figure can be
reported
Section 14
The production target from which the forecast financial information is
derived (including all the information contained in rule 5.16)
Section 14
If a significant proportion of the production target is based on an
exploration target, the implications for the forecast financial
information of not including the exploration target in the production
target
Not Applicable
6
Table of Contents
0. Glossary of Terms ................................................................................................................10
1. Introduction ......................................................................................................................... 11
1.1 DFS Addendum Objectives ............................................................................................. 11
1.2 Competent Person Statement .........................................................................................13
1.3 Legal Disclaimers ...........................................................................................................13
2. The Kachi Project DFS Addendum Overview .........................................................................13
2.1 Inclusions ......................................................................................................................14
2.2 Exclusions .....................................................................................................................14
3. Geology & Hydrogeology ......................................................................................................14
3.1 Summary .......................................................................................................................14
3.2 Basin Scale Hydrogeologic Conceptual Model .................................................................18
4. Mineral Resource & Reserve ................................................................................................19
4.1 Summary .......................................................................................................................19
4.2 Measured Resource .......................................................................................................20
4.3 Modeling........................................................................................................................21
4.4 Ore Reserve ..................................................................................................................22
5. Extraction Methods and Design.............................................................................................23
5.1 Summary .......................................................................................................................23
5.2 Well field Development Plan ...........................................................................................23
5.3 Geoc hemical Analyses ...................................................................................................23
5.4 Drilling and Construction.................................................................................................23
5.5 Brine Gathering Net work.................................................................................................23
5.6 Environment al................................................................................................................24
6. General Infrastructure ..........................................................................................................24
6.1 Power Supply ................................................................................................................24
6.2 Raw Water Supply..........................................................................................................27
6.3 Accommodation Camp....................................................................................................27
6.4 Plant and Wellpad Access Roads ....................................................................................27
6.5 Waste Management Facilities .........................................................................................27
7. Metallurgy............................................................................................................................28
7.1 Summary .......................................................................................................................28
7.2 Design Basis..................................................................................................................30
7.3 Metallurgical Test Work ...................................................................................................32
7.4 Mass-Energy Balance and Process Flow Diagrams ..........................................................32
7.5 Process Description .......................................................................................................36
7.6 Process Waste, Effluents and Emissions .........................................................................39
8. Process Plant Design ...........................................................................................................41
7
8.1 General .........................................................................................................................41
8.2 Non-P rocess Buildings/Services......................................................................................41
8.3 Site Utilities and Services ...............................................................................................41
8.4 Process Areas................................................................................................................41
9. Logistics ..............................................................................................................................43
10. Project Execution Plan........................................................................................................43
11. Capital Expenditure ............................................................................................................43
11.1 Summary .....................................................................................................................43
11.2 Roles and Responsibilities ............................................................................................44
11.3 Estimate Summary .......................................................................................................45
11.4 Estimate General Basis.................................................................................................48
11.5 Indirect Costs ...............................................................................................................49
11.6 Cost Variation 2023 – 2025 ...........................................................................................50
12. Operational Expenditure .....................................................................................................52
12.1 Summary .....................................................................................................................52
12.2 Operating Cost Basis of Estimate ..................................................................................54
12.3 Balance of Plant ...........................................................................................................54
12.4 DLE System Basis........................................................................................................55
13. Market Analysis / Overview .................................................................................................55
13.1 Price Trends and Forecast ............................................................................................55
13.2 Demand Overview ........................................................................................................56
13.3 Supply Outlook .............................................................................................................57
13.4 Geopolitical and Trade Considerations ...........................................................................57
13.5 Marketing Strat egy .......................................................................................................57
14. Economic and Financial Analysis ........................................................................................58
14.1 Summary .....................................................................................................................58
14.2 Key Financial Modelling Assumptions ............................................................................58
14.3 Key Financial Model Outputs.........................................................................................63
14.4 Forecast Estimated Global Cost Curve Position..............................................................68
14.5 NPV Sensitivity ............................................................................................................69
14.6 IRR Sensitivity..............................................................................................................71
14.7 Project Financing .........................................................................................................73
15. Environment al and S ocial Impact Assessment (EIA) .............................................................73
16. Risks (Threats and Opportunities) .......................................................................................73
17. Permitting Plan ..................................................................................................................73
APPENDIX 1: JORC Table 1 ....................................................................................................74
Section 1.............................................................................................................................75
Section 2.............................................................................................................................82
8
Section 3.............................................................................................................................87
Section 4.............................................................................................................................95
APPENDIX 2: Updated Resource Estimate of Contained Lithium .............................................. 105
APPENDIX 3: Proved and Probable Lit hium Reserves ............................................................. 107
9
0. Glossary of Terms
Term
Definition
amsl
Above mean sea level
bgs
Below ground surface
BOP
Balance of Plant
CAGR
Compound Annual Growth Rate
C-A
Chlor-alkili
CLN
Connected linear network
CRP
Communities Relation Plan
DFS
Definitive Feasibility Study
DIA
Declaración de Impacto Ambiental (Environmental Impact Declaration)
DLE
Direct Lithium Extraction
DMS
Data Management System
EBITDA
Earnings Before Interest, Tax, Depreciation and Amortization
EMS
Environmental Management System
EPCM
Engineering Procurement Construction Management
ESIA
Environmental and Social Impact Assessment
FEED
Front End Engineering Design
FID
Final Investment Decision
GWMP
Groundwater and Surface Monitoring Plan
HCL
Hydrochloric Acid
InSAR
Interferometric Synthetic Aperture Radar
IPP
Independent Power Provider
IRR
Internal Rate of Return
KLP
Kachi Lithium Pty Ltd
KPI
Key Performance Indicator
ktpa
Kilo (1000) tonnes per annum
Lake
Lake Resources N.L.
LCE
Lithium Carbonate Equivalent
LoM
Life of Mine
lps
Litres per second
Mt
Million tonnes
MVM
Morena del Valle SA
NaOH
Sodium Hydroxide
NPV
Net Present Value
O&M
Operations and Maintenance
PPA
Power Purchase Agreement
TARP
Trigger Action Response Plan
WACC
Weighted Average Cost of Capital
WFDP
Well Field Development Plan
ZLD
Zero Liquids Discharge
10
1. Introduction
This Report presents an update to the Original DFS, incorporating outcomes from a value engineering
study conducted to identify potential opportunities for capital and operating cost reductions. It should
be read as an addendum or update to the Original DFS.
1.1 DFS Addendum Objectives
Following the completion of the Original DFS, Lake undertook a value engineering review to assess
potential design optimisations. This DFS Addendum updates the capital and operating costs estimates
by integrating those design changes, while also accounting for equipment cost escalation, updated
unit rates and revised scaling assumptions. The Original DFS provided an AACE class 3 estimate for
CAPEX and OPEX, this Addendum builds on that foundation with refined inputs and improved design
data.
The following major design changes have been incorporated into the DFS Addendum (all more fully
described in the body of the document):
1.1.1 Revised Lithium (Brine) Concentration
The plant design in the Original DFS used an average brine lithium concentration of 205 mg/L despite
model-predicted brine concentrations of over 255 mg/L in the first 7 years of mining and averaging
245 mg/L in years 8 to 25. Based on these earlier studies, the design basis for the DFS Addendum
was set to 249 mg/L. The higher lithium concentration in combination with higher DLE recovery rates
leads to:
•
•
•
Additional savings in CAPEX with potential elimination of five wells and related infrastructure.
OPEX reduction (lower extraction and injection pumping costs).
Reduced flowrates and plant size in the brine pre-treatment and spent brine handling
sections.
The Ore Reserve update 7, which was further optimized to eliminate additional low lithium
concentration production wells, modelled an average lithium grade of 268 mg/L. The higher reserve
lithium concentration stems from the fact that the DFS Addendum work and the Ore Reserve ran in
parallel, with a conservative value being selected as the DFS Addendum design basis. This highlights
potential opportunity for additional cost optimisations not fully considered in the DFS Addendum.
1.1.2 Switching Brine Gathering Pipeline to High-Density Polyethylene (HDPE)
Initially, the pipeline systems (freshwater, production, and reinjection) were designed with cross-linked
polyethylene (PE-X) pipe (a type of cross-linked HDPE sold by Pexgol). However, following
engineering analysis, it was decided to switch PE-X with HDPE. The justifications for replacing PE-X
with HDPE were:
•
•
HDPE pipes are less expensive than PE-X pipes, while remaining durable and meeting the
design requirements for the Project.
Due to its longer length and availability on reels, HDPE pipe requires fewer joints or
connections, reducing points of failure and making installation and repair easier.
7 Refer to ASX Announcement dated 4 August 2025 – “Kachi Updated Ore Reserve”
11
1.1.3 Direct Lithium Extraction Technology (Generation 4) Improvements
In June 2024 8, Lilac Solutions (“Lilac”) introduced its Generation 4 (“Gen 4”) lithium extraction
technology building on the prior Generation 3 (“Gen 3”) design. Gen 4 delivers substantial
performance and cost benefits for the Project, including:
•
•
•
•
•
Improved durability of Lilac's proprietary ion exchange (“IX”) media, with the functional
lifespan increasing from 2,200 cycles (Gen 3) to over 4,300 cycles (Gen 4).
Higher lithium recovery, with lifetime average recovery increased to 90%, compared with 80%
under Gen 3 for the Kachi brine.
Approximately 39% reduction in capital cost for IX package, driven by increased performance
and fewer IX modules.
More than 30% reduction in water consumption and over 55% reduction in wash water
generation. Supporting the Project's environmental objectives while lowering utility-related
capital and operating costs.
Up to 70% reduction in consumption of certain reagents, further improving operational
efficiency.
1.1.4 Revised Overall Power Needs
The cumulative impact of the above-mentioned design changes has led to a significant reduction in
overall power requirements, lowering operational energy demand and distribution infrastructure costs.
1.1.5 Elimination of Ultrafiltration System
Improvements in Lilac’s Gen 4 technology have also relaxed brine pre-treatment requirements. As
confirmed in the DFS Addendum, this has enabled the replacement of the previously required
ultrafiltration system with a pressure filtration system. The change reduces capital expenditure and
streamlines process design, while maintaining compatibility with enhanced IX performance.
1.1.6 Modularization (Reducing Onsite Construction Workforce)
Initial projections in the Original DFS anticipated a peak construction workforce of approximately
1,400 personnel. With improved understanding of site conditions, including high altitude, severe
weather, sandstorms, the benefits of minimizing onsite workforce have become clear. Increased
offsite modularization will reduce workforce and camp size requirements onsite, improving safety and
lowering costs.
1.1.7 Update to the Brine Gathering Network
Since the Original DFS, the field development plan was optimized, which resulted in a reduction of the
number of wells and their locations. Analysing the proximity of the wells to the facility and the
elevation profiles allowed the identification of any pressure gains and losses in the line, which were
minimal in comparison to the system that was previously in place.
Leveraging updated hydrogeological data, the gathering pipeline layout will be redesigned and is
characterized by reduced piping distances and the removal of the centroid ponds. These design
changes will result in capital and operating cost savings.
1.1.8 Construction Schedule Optimization
The phased construction strategy outlined in the Original DFS (Phase A delivering 12.5 ktpa capacity,
followed by Phase B to achieve 25 ktpa) has been replaced by a single-phase approach delivering full
25 ktpa nameplate capacity from initial commissioning. This revision eliminates Phase 1 specific
infrastructure and equipment, reduces total CAPEX and removes the need for interim reagent
purchase. The integrated execution strategy also compresses the overall project delivery timeline
significantly.
8 See https://lilacsolutions.com/news/lilac-unveils-latest-generation-technology
12
1.2 Competent Person Statement
The information contained in this DFS Addendum relating to Exploration Results, Production Targets,
M