LKE Conference Presentation
Released
Released
Announcement PDF
10-12 February 2026
OTC Markets Precious Metals & Critical
Minerals Investor Conference
Presenter: David Dickson MD/CEO
Disclaimers
General Statement and Cautionary Statement
This presentation has been prepared by Lake Resources N.L. (Lake) for information purposes and not any particular party. The information in this presentation is based upon public information and internally developed data and
reflects prevailing conditions and views as of this date, all of which are accordingly subject to change. The information contained in this presentation is of general nature and is not intended to address the circumstances of any
particular individual or entity. There is no guarantee that the information is accurate as of the date it is received or that it will continue to be accurate in the future. No warranties or representations can be made as to the origin,
validity, accuracy, completeness, currency or reliability of the information. No one should act upon such information without appropriate professional advice after a thorough examination of the particular situation. Lake Resources NL
accepts no responsibility or liability to any party in connection with this information or views and Lake disclaims and excludes all liability (to the extent permitted by law) for losses, claims, damages, demands, costs and expenses of
whatever nature arising in any way out of or in connection with the information, its accuracy, completeness or by reason of reliance by any person on any of it. The information regarding projects described in this presentation are
based on exploration targets, apart from the Kachi project’s resource statement. The potential quantity and grade of an exploration target is conceptual in nature, with insufficient exploration to determine a mineral resource and
there is no certainty that further exploration work will result in the determination of mineral resources or that potentially economic quantities of lithium will be discovered.
Forward Looking Statements
Certain statements contained in this presentation, including information as to the future financial performance of the projects, are forward-looking statements. Such forward-looking statements are necessarily based upon a number
of estimates and assumptions that, while considered reasonable by Lake Resources N.L. are inherently subject to significant technical, business, economic, competitive, political and social uncertainties and contingencies; involve
known and unknown risks and uncertainties and other factors that could cause actual events or results to differ materially from estimated or anticipated events or results, expressed or implied, reflected in such forward-looking
statements; and may include, among other things, statements regarding targets, estimates and assumptions in respect of production and prices, operating costs and results, capital expenditures, reserves and resources and
anticipated flow rates, and are or may be based on assumptions and estimates related to future technical, economic, market, political, social and other conditions and affected by the risk of further changes in government regulations,
policies or legislation and that further funding may be required, but unavailable, for the ongoing development of Lake’s projects. Lake Resources N.L. disclaims any intent or obligation to update any forward-looking statements,
whether as a result of new information, future events or results or otherwise. The words “believe”, “expect”, “anticipate”, “indicate”, “contemplate”, “target”, “plan”, “intends”, “continue”, “budget”, “estimate”, “may”, “will”,
“schedule” and similar expressions identify forward-looking statements. All forward-looking statements made in this announcement are qualified by the foregoing cautionary statements. Investors are cautioned that forward-looking
statements are not guarantees of future performance and accordingly investors are cautioned not to put undue reliance on forward-looking statements due to the inherent uncertainty therein. Lake does not undertake to update any
forward-looking information, except in accordance with applicable securities laws.
Compliance Statement
The information contained in this presentation relating to financial forecasts, production targets, exploration targets, exploration results, Measured, Indicated and Inferred resource estimates, project execution, infrastructure and
testing work, has been derived from the information in Lake’s Kachi Project Phase One Definitive Feasibility Update Study Results (“DFS Addendum”) and Lake’s Updated Ore Reserve Statement (“Ore Reserve Update”) both announced on
ASX on 4 August 2025 and mineral resource update announced on ASX on 3 June 2025. Lake confirms that it is not aware of any information that materially affects the information included in the DFS Addendum or the Ore Reserve
Update both announced on ASX on 4 August 2025 and mineral resource update announced on ASX on 3 June 2025 and all material assumptions contained in those announcements continue to apply and have not materially changed,
including all material assumptions underpinning the production targets or forecast information derived from production target, and all technical parameters underpinning the estimates of mineral resource and ore reserves. On this basis,
Lake confirms that the findings of Mr. Andrew Fulton, the Competent Person, in the DFS Addendum and the Ore Reserve Update both announced on ASX on 4 August 2025 and, in respect of Lake’s mineral resource, in the mineral resource
update announced on 3 June 2025,have not changed nor been modified in any material respects since those announcements.
1Kachi is owned 80% by Lake Resources and 20% by Lilac Solutions. 2Refer to ASX announcement 4 August 2025 – Kachi Project Definitive Feasibility Study Addendum. 3Refer to ASX announcement dated 4 August 2025 – Updated Lithium Ore Reserve.
About Lake Resources
3
Kachi Project1 Highlights
Location Catamarca Province, Argentina
Project Stage
Phase 1 DFS completed in December 2023
Phase 1 DFS Addendum completed in August 2025
Exploitation EIA approval now expected in 2026
Products Battery Grade Lithium Carbonate (>99.5% purity)
Resources2
11.1 Mt LCE
— Measured and Indicated: 8.2 Mt LCE
— Inferred: 2.9 Mt LCE
DFS Update Design basis: 249mg/L2
— Average brine concentration: 268mg/L3
Project Execution
Approach
Phase 1 – 25 ktpa target plant capacity
Potential Phase 2 – construction of second plant with additional total
capacity of 25 ktpa (including additional expansion in subsequent phases)
Mine Life 25 years2
Strong commitment to
responsible lithium
development
Experienced leadership strongly
aligned to shareholder value
creation
Strong relationship with the
provincial government of
Catamarca
Developing a world class global lithium asset in Argentina – the largest, independent
development project across the lithium triangle with significant expansion potential
Clear strategy with significant
upside
Major Milestones Achieved in 2025
4
De-Risking Kachi Through Strategic Advancement
1 Refer to ASX announcement dated 4 August 2025. 2 Refer to ASX announcement dated 3 June 2025. 3 Refer to ASX announcement 4 August 2025 – Updated Lithium Ore Reserve. 4 Refer to ASX announcement dated 2 July 2025. 5 Refer to ASX announcement
dated 18 December 2025. FEED = Front End Engineering Design
Completed
Kachi Phase One
DFS Addendum1
JORC Update Increased Total
Resource To
11.1Mt LCE2
Completed
Power Supply
FEED4
Ore Reserve Statement
Confirmed Lithium Grade Of
268 mg/L3
Continue To Engage With
Offtake and
Strategic Partners
Achieved Key EIA Milestone
Ramsar Site
Zonification5
Kachi Project Phase One DFS Addendum
5
Transformational Project Improvements: Significantly Enhanced Economics & Operational
Efficiencies1
US$ 1.16B
Capex
US$ 5,895/t
Opex
US$ 1.5B
Pre-Tax NPV10
22.5%
Pre-Tax IRR
249mg/L
Plant Design Basis
8.2 Mt LCE Measured & Indicated resource (+12% vs.
Original DFS)
11.1 Mt LCE Total Resource (+5% vs. Original DFS)
~22% reduction in well count (vs. Original DFS)
15-20% reduction in plant footprint (vs. Original DFS)
Completion of FEED marks achievement of critical de-
risking milestone for grid power
Lilac Gen 4 IX technology improvements
• ~90% recovery rate (+13% vs. Original DFS)
• 50% reduction in number of DLE modules
• 39% lower DLE Capex and 40% lower DLE Opex
• Greater throughput and longer IX media cycle
Further Capex and Opex reduction possible due to
improved brine concentration of 268 mg/L and Lilac
Gen5 Ion Exchange technology2
Resource Excellence & De-risking Technology and Cost Optimization
1 Refer to ASX announcement dated 4 August 2025. 2Refer to Lilac announcement dated 28 October 2025.
Gen 5 DLE ion exchange technology release
Delivers improvements in brine pre-treatment requirements, media productivity, cycle life, recovery rates and eluate quality
Simplifies flowsheets
Potentially reduces Kachi’s capital and operating costs
Completed construction of Lilac’s commercial-scale ion exchange media (IXM) manufacturing line in Nevada, USA
To produce 200 tonnes of IXM per annum
o Sufficient to support production of up to 100,000 tonnes of lithium carbonate equivalent per annum
Project leverages proven Gen 5 Lilac ion exchange technology which achieved 87% lithium recovery for 69 mg/L lithium
concentration
Lilac DLE Technology Update
6
Lilac continues to mark important achievements including unveiling its Gen 5 ion exchange
DLE technology, completing construction of commercial scale manufacturing facility and
signing a binding offtake agreement
1Refer to ASX announcement dated 30 October 2025.
Released Gen 5 DLE ion exchange technology1
Completed construction of Lilac’s commercial-scale ion exchange media (IXM) manufacturing line in Nevada, USA
Signed 10-year binding offtake agreement with Traxys NA for lithium carbonate at Lilac’s planned facility in Utah, USA
Operational Update
7
Kachi continues to achieve key milestones on its path to becoming “shovel-ready”
1 Refer to ASX announcement dated 18 December 2025. 2Timing of final approval of the Exploitation EIA is controlled by the government of Catamarca.
• Ramsar site zonification was formally approved1
• Carachi Pampa lagoon designated as Zone 3 (Z3),
allowing for regulated productive use
• Continued close coordination with Catamarca Ministries
of Environmental and Mining
• Estimated timeline for EIA final approval is 1H20262
Power Supply
• Continued engagement with YPF Luz on Northern Power-
Line option
• Ongoing effort to explore alternative power solutions
Power Supply
Exploitation Environmental Impact Assessment
Argentina Macro and Political Update
8
Following President Milei’s Party’s decisive victory in October 2025, the political and
economic landscape continues to improve
Events Summary Implications for Lake
Inflation Drop
35% annual inflation
for 2025
• Staggering drop in inflation from the 117% seen in 2024 Positive
Debt
Repayments
$4.2 billion debt
maturity
• The government successfully made the payment in January 2026
• Boosted by a $3 billion repurchase agreement (“repo”) with six int’l banks
Positive
EU-Mercosur
Deal
Signed historic EU
deal after 25 years
• Historic, long-awaited Free-Trade Agreement between Mercosur1 and the
European Union was signed January 17, 2026
Positive
Reforms
Continued reform due
to Milei congressional
control
• Catalyst for push through of “Second Stage” reforms including
• Aggressive deregulation of labor markets
• Overhaul of tax laws and spending cuts
• Privatization of major state assets
Likely Positive
Financial
Markets
Investors betting on
new wave of reforms
• Sovereign risk hit a seven-year low
• Argentine Global bonds have seen a 12-15% price increase since December
• Continued Peso resilience
Positive
Continued optimism and positive momentum for foreign direct investment in Argentina
1Mercosur members are Argentina, Brazil, Paraguay & Uruguay.
Recent US / Argentina Developments
9
Last week’s meetings in Washington, D.C. represent the most significant realignment in US-
Argentina relations in decades
Event Date Details
Private
Gala @
Mar-a-Lago
Feb 10
President Milei to attend as
guest and may give a speech
Argentina
Week in
New York
March
9 – 11
President Milei to participate in
three-day event organized by
JPMorgan, Bank of America and
other financial institutions to
position Argentina as attractive
investment destination
US Foreign
Policy
Conference
April 2
Major international conference
on US-Global relations is
scheduled to take place in
Mendoza, Argentina
Major Headlines from Washington DC (Feb 4 – 6)
2. Financial and Security Cooperation
• US reaffirmed support for $20B credit line to Argentina
• Export controls on dual-use technology (AI, quantum, sensitive
hardware) to prevent access by US adversaries via South America
4. Critical Minerals Framework (aligned with Project Vault)
• Argentina committed to prioritize the US and its allies for exports of
lithium and copper
• Priority mining projects in Argentina to receive direct US government
support via Project Vault to be jointly identified within next six months
1. Reciprocal Trade & Investment Agreement (ARTI)
• Tariff elimination on 1,675 Argentine products and Argentina scrapping
barriers on 200+ US categories
• Argentine beef import quota expansion – 20K to 100K tonnes
• Argentina regulatory fast track for US FDA approved items
• “No digital tax” policy and cross-border data sharing
3. Project Vault (US Critical Minerals Strategic Reserve)
• $12B funding to stockpile globally sourced critical minerals – lithium,
copper, cobalt, nickel and rare earth elements in secure US facilities
• Major companies including GM, Boeing, GE Vernova and Google signed
on as “offtakers” for the reserve
Upcoming Events
Source: US Government public announcements, news sources.
Lithium Price Rally
10
Lithium prices have experienced an explosive rally between mid-November 2025 and February 2026, driven by
a combination of aggressive supply cuts and a massive surge in demand from the energy storage sector,
marking a definitive end to the "lithium winter" of 2023–2024
Lithium Carbonate (Li2CO3 EXW China, BG)1
Latest Price (5 Feb) $21,924
Change from Nov 25 –
Feb 26
+$9,489/t
(+79%)
Lithium Hydroxide (LiOH EXW China, BG)1
Latest Price (5 Feb) $17,138
Change from Nov 25 –
Feb 26
+$7,238/t
(+73%)
Spodumene (Li2O FOB Australia)1
Latest Price (5 Feb) $2,065
Change from Nov 25 –
Feb 26
+$1,020/t
(+98%) 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035
5
10
15
0
20
25
35
15.0
18.5
Benchmark Minerals Q4 2025
12.3
$/kg LCE
11.3
JP Morgan
14.0
Goldman Sachs Jan 16 2026
Canaccord Jan 14 2026
29.5
14.0 Barrenjoey Jan 5 2026
Spot Feb 05 2026
11.8
11.1
13.3
32.5
16.8
22.9
14.0
22.5
15.0
15.0
18.0
22.5
Long Term Incentive Prices
Canaccord Genuity - $22.5/kg
Benchmark Minerals - $18/kg (previously $19)
JP Morgan - $15/kg
Barrenjoey - $15/kg
Goldman Sachs - $14/kg
Battery Grade Lithium Carbonate Price Forecasts
Source: Canaccord Genuity (CGF) EV Materials Equity Research Jan 2026, Benchmark Minerals Lithium Price Assessment, Benchmark Minerals Q4 2025 Lithium Forecast, Goldman Sachs Australian Lithium & Gold Coverage January 16 2026, Barrenjoey Research
November, 2025. Spot Price as of February 5, 2026, per Benchmark Minerals International. Figures in USD, real prices.
1Li2CO3 EXW China (Battery Grade), LiOH EXW China (Battery Grade) and Li2O FOB Australia prices as of 14 January 2026.
Note: The Company does not verify the accuracy of information derived from BMI or from other company presentations or reports.
Lithium Market Supply/Demand Balance
11
Source: Canaccord Genuity (CGF) EV Materials Equity Research Jan 2026, Barrenjoey Research Jan 2026, Benchmark Mineral Intelligence Dec 2025, Goldman Sachs Australian Lithium & Gold Scenarios Jan 2026, and JPMorgan Lithium Outlook October 2025. Note: The
Company does not verify the accuracy of information derived from, Canaccord, Benchmark Mineral, Barrenjoey Goldman Sachs and JPMorgan or from other company presentations or reports. 1 Barrenjoey Research dated 12 November 2025 indicated revised 2026 and
2027 Lithium Carbonate/Hydroxide prices of $29,500/t and $22,875/t respectively. 2 Barrenjoey Research dated 12 November 2025 indicated revised 2026 and 2027 Spodumene prices of $3,250/t and $2,325/t respectively.
However, significant demand growth is anticipated to induce market shortfall beginning in 2029
Barrenjoey, Canaccord, Goldman, and BMI have significantly increased their 2026-2030
lithium price forecasts from Nov 2025, driven by ESS demand growth, and a slow supply
response due to prolonged China restarts
Battery Supply Demand Balance (JPM Estimates)
Li2CO3 2026 Forecast Nov | Jan (US$/kg)
Canaccord 12.3 | 32.5
Goldman 8.6 | 14.0
Barrenjoey1 11.5 | 29.5
BMI 8.9 | 11.3
Spodumene 2026 Forecast Nov | Jan (US$/kg)
Canaccord 0.9 | 2.8
Goldman 0.8 | 1.7
Barrenjoey2 1.0 | 3.3
BMI 0.9 | 1.0
2026 Price Revisions – Nov ‘25 vs. Jan ‘26
Broker Sentiment – Prices have bottomed, the upcycle is HERE
-100
0
100
200
0
500
1,000
1,500
2,000
2,500
3,000
-150
-50
50
150
Deficit
/
Surplus
(‘000
LCE)
Supply
/
Demand
of
Lithium
(‘000
LCE)
2024 2025 2026 2027 2028 2029 2030
-73K
-88K
Mine Supply + Recycling (LHS) Total Demand (LHS) Surplus Deficit
Source: JP Morgan Lithium Outlook October 2025, Goldman Sachs Australian Lithium & Gold Scenarios Jan 2026.
Note: The Company does not verify the accuracy of information derived from BMI or from other company presentations or reports.
12
However, significant demand growth is anticipated to induce market shortfall beginning in 2029
Lithium Market Demand Outlook
Lithium demand expected to double between 2025 and 2030, driven by the BESS boom and
continued strong EV demand in Asia and Europe
0
500
1,000
1,500
2,000
2,500
3,000
3,500
(‘000
LCE)
933
(60%)
423
(27%)
210
(13%)
2025 2026 2027 2028 2029
1,565
(55%)
1,009
(36%)
255
(9%)
2030
EVs
BESS
Other
1,566
2,829
JPM: 2025-2035 CAGR = 13%
Global Lithium Demand
BESS is the new EV, but baseline EV demand is still growing strongly
901
(64%)
195
(14%)
318
(22%)
2025 2026 2027 2028 2029
1,982
(64%)
638
(21%)
464
(15%)
2030
EVs
BESS
Other
1,414
3,084
GS: 2025-2035 CAGR = 17%
1.7x EV growth
2.4x BESS growth
1.2x Other growth
2.2x EV growth
3.3x BESS growth
1.5x Other growth
Lake Resources Financial Highlights Q4 20251
13
Financial Position & Liquidity
Cash position of A$15.3M at 31 December 2025
with zero debt
Pro-forma quarter-end liquidity
of ~A$15.8M, including option exercise proceeds of
~A$0.5M ATM proceeds received post-quarter
Cost Management
45% reduction in 2025 cash expenditures vs. 2024,
exceeding projections
Actively monitoring cash balance and minimizing
outgoings
Capital Allocation
Funds allocated to finalize Exploitation EIA, evaluate
power options and advance strategic alternatives
Business right-sizing improves liquidity outlook
Outlook
Continue to evaluate opportunities for organizational
right-sizing in CY 2026
Significant financial flexibility to provide capital for
operational priorities including securing strategic
partners and offtakers
Strong Balance Sheet and Disciplined Capital Management
1 Refer to ASX announcement dated 4 February 2026.
Lake Resources Strategic Priorities
14
o Obtain EIA Approval
o Continue to optimize technical and commercial power solutions
o Engage with Offtake and Strategic Partners
o Continue to optimize cost structure and extend financial runway
o Work towards FID
Key areas of focus in 2026 and beyond
Board of Directors
Lake Resources Leadership Team
15
Experienced, well-
credentialed and highly
motivated leadership
team ready to deliver on
Lake’s strategy and
accelerate the Company’s
next phase of Kachi
development
Leadership
experience
acquired across
technical, financial
and project execution
Don Miller
Chief Financial Officer
Justin Olson
Chief Legal Officer
Stu Crow
Non-Executive Chairman
Robert Trzebski
Non-Executive Director
David Dickson
Managing Director / CEO
Barbara Cozzi
Country Manager, Argentina
Thank You
Appendix
Lilac DLE Technology Update – Gen 5 Ion Exchange
18
Higher performance than any competing DLE technology featuring lower costs with first
quartile economics
Gen 3 Lilac IX
(Original DFS)
Gen 4 Lilac IX
(DFS
Addendum)
Gen 5 Lilac IX
Lithium
Recovery
80% 90% >95%
Media
Productivity
(kg LCE/day/m3)
550 800 1,500
IXM Cycle Life 2,200+ 4,000+ 10,000+
Lilac Solutions has developed Gen 5 lithium extraction technology that significantly outperforms conventional methods and addresses key industry
challenges around cost, sustainability, and scalability
The Gen 5 technology delivers breakthrough performance improvements across the following critical areas:
Media productivity is 20x higher than alumina adsorbents
Lithium recovery rates increased from 90% (Gen 4) to 95%+
Extended IX media durability delivers up to 10,000 cycles before replacement
Impurity rejection of 99.9%+ (like Gen 4 IX)
Solids tolerance allows passage of 70x larger particles and avoids expensive
ultrafiltration versus alumina adsorbents
10x lower water consumption compared to alumina adsorbents
Eluate quality: 7x higher lithium concentration and higher purity with 100x lower
Li:B ratio than alumina adsorbents
For more information, refer to Lilac announcement dated 28 October 2025 and its accompanying whitepaper.
Potential incremental Kachi Capex / Opex savings with Gen 5 IX vs. Gen 4 IX
Note: This table has been directly extracted from the JORC update announced on 3 June 2025. Lake Resources N.L. confirms that it Is not aware of any information that materially affects the information included in Lake's JORC update announced on ASX on 3 June 2025
and all material assumptions contained in that announcement continue to apply and have not materially changed.
Measured May 2025 (to 600 m depth)
Unit
Sediment
Volume (m
3
)
Specific
Yield %
Brine
Volume (m
3
) Liters
Li
(mg/l)
Li
(Grams)
Li
(Tonnes)
Tonnes
LCE
A 10,339,000,000 0.078 806,442,000 806,442,000,000 0.210 169,352,820,000 169,000 901,000
B 4,385,500,000 0.088 385,740,000 385,740,248,000 0.229 88,334,517,000 88,000 470,000
C to 400 7,561,800,000 0.068 514,202,000 514,202,400,000 0.230 118,266,552,000 118,000 629,000
Fan West to 400 11,088,000,000 0.095 1,053,360,000 1,053,360,000,000 0.220 231,739,200,000 232,000 1,233,000
K24 – K25
below 400
7,744,200,000 0.093 720,211,000 720,210,600,000 0.250 180,132,593,000 180,000 958,000
Total 41,118,500,000 3,479,955,000 3,479,955,248,000 787,825,682,000 788,000 4,191,000
Unit
Sediment
Volume (m
3
)
Specific
Yield %
Brine
Volume (m
3
) Liters
Li
(mg/l)
Li
(Grams)
Li
(Tonnes)
Tonnes
LCE
A 3,870,500,000 0.08 309,640,000 309,640,000,000 0.185 57,283,400,000 57,000 305,000
B 1,569,100,000 0.079 123,959,000 123,958,900,000 0.191 23,676,150,000 24,000 126,000
C 5,446,470,000 0.074 404,338,000 404,338,308,000 0.218 88,218,532,000 88,000 469,000
Fan North 9,109,970,000 0.102 929,217,000 929,216,940,000 0.232 215,578,330,000 216,000 1,147,000
Fan South 2,767,500,000 0.093 257,378,000 257,377,500,000 0.239 61,513,223,000 62,000 327,000
Under volcano 6,718,700,000 0.074 500,187,000 500,187,059,000 0.193 96,425,185,000 96,000 513,000
Total 29,482,240,000 - 2,522,621,000 2,522,620,663,000 - 542,294,093,000 542,000 2,885,000
Inferred May 2025
Mineral Resource Estimate Table
Unit
Sediment
Volume (m
3
)
Specific
Yield %
Brine
Volume (m
3
) Liters
Li
(mg/l)
Li
(Grams)
Li
(Tonnes)
Tonnes
LCE
A (South) 3,694,300,000 0.076 278,924,000 278,924,453,000 0.181 50,485,326,000 50,000 269,000
B (South) 1,489,000,000 0.075 111,544,000 111,543,670,000 0.179 19,927,611,000 20,000 106,000
C (South) 4,434,492,000 0.067 297,111,000 297,110,964,000 0.182 54,076,275,000 54,000 288,000
A (North) 3,075,200,000 0.095 292,144,000 292,144,000,000 0.232 67,776,824,000 68,000 361,000
B (North) 4,294,400,000 0.102 438,029,000 438,028,800,000 0.241 105,431,342,000 105,000 561,000
C (North) 4,115,300,000 0.102 419,761,000 419,760,600,000 0.182 76,396,429,000 76,000 406,000
D (North) 5,073,100,000 0.102 517,456,000 517,456,200,000 0.182 94,177,028,000 94,000 501,000
K21 8,304,500,000 0.065 541,394,000 541,393,608,000 0.192 103,822,511,000 104,000 552,000
Under Measured
ABC 400 – 600
7,453,100,000 0.067 501,818,000 501,817,968,000 0.242 121,529,774,000 122,000 647,000
Under Measured
Fan 400 – 600
3,775,900,000 0.063 239,343,000 239,343,351,000 0.242 57,850,485,000 58,000 308,000
Total 45,709,292,000 3,637,524,000 3,637,523,614,000 0 751,473,605,000 751,000 3,998,000
Combined Measured + Indicated
86,827,792,000 7,117,478,861 7,117,478,861,140 1,539,299,286,959 1,539,299 8,189,000
Indicated May 2025 (to 600 m depth)
19
Reserve Statement
Note: This table has been directly extracted from the Updated Ore Reserve statement announced on ASX on 4 August 2025. Lake Resources N.L. confirms that it is not aware of any information that materially affects the information included in the Updated Ore Reserve
statement announced on ASX on 4 August 2025 and all material assumptions contained in that announcement continue to apply and have not materially changed.
Reserve Category Years
Lithium
(Tonnes)
LCE
(Tonnes)
Average Lithium
(mg/L)
Proved 1 4,390 23,310 270
Proved 2 – 7 28,360 150,850 270
Probable 8 – 25 85,060 452,540 267
Total 1 – 25 117,810 626,760
Reserve Statement
20
Share your feedback
Discover