Further Drilling at Flagship Kachi Project Measures High Lithium
Concentrations South of the Planned Wellfield
•
K25D44, the last drillhole associated with the 2023 drilling program was completed
in December 2023 and is located south of the surface expression of the salar.
•
Results show brines returning grades of 230 - 302 mg/L lithium over 407 metres (215
– 622 m) with an average of 257 mg/L.
•
The best results are from 239 to 250 meters below ground surface (m bgs) averaging
grades of 302 mg/L lithium.
•
K25D44 is the third drillhole to demonstrate the presence of lithium bearing brine
to a depth of more than 600 metres.
•
Results validate modelled lithium grades used in the Ore Reserve modelling in the
vicinity of K25D44.
•
K25D44 results establish the continuity of lithium brine grades, chemistry and
stratigraphy south of the currently planned wellfield, at least as far south as K21.
Clean lithium developer Lake Resources N.L. (ASX: LKE; OTC: LLKKF) (“LAKE” or “the Company”) reports
that drilling completed at the Kachi Lithium Brine Project (“Kachi” or the “Project”) in Catamarca
Province, Argentina continues to intercept lithium bearing brine in sand units favourable to extraction
over thick intervals in the southern portion of central resource area.
The K25D44 drillhole (Figure 1 and Figure 2) was not completed in time to be incorporated into the
Project’s Definitive Feasibility Study (DFS) for Phase One, released in December 2023. However, the
results from the drillhole confirm the presence of higher-grade lithium brine south of the central
resource area to a depth of more than 600 m. The results further support the positive
hydrogeological modelling results that were the basis for the Project Ore Reserve 1 and Definitive
Feasibility Study 2 (DFS) submitted in December 2023. The DFS highlights include:
•
Total resource is estimated at 10.6 Mt LCE, a globally significant resource 3.
•
25-year life of mine (LoM) supported by maiden Ore Reserve statement.
See 19 December 2023 Lake Resources ASX Announcement - Maiden Ore Reserve Defined Lake Resources
Flagship Kachi Project
2
See 19 December 2023 Lake Resources ASX Announcement – Kachi Project Phase One Definitive Feasibility
Study
3
See Table 3 for a breakdown of the resource into measured, indicated and inferred categories
1
•
Phase One targets a production of 25,000 tonnes per annum (tpa) over the LoM to meet the
growing demand and specifications of the battery market. 4
•
The 25,000 tpa operation recovers only a small fraction of the Measured and Indicated
Resource, which allows Lake to study further expansions.
•
DLE process tailored to mitigate impact on the local community with minimal disruption to
land, freshwater table, and water usage.
•
The Project targets production of consistent battery grade lithium carbonate (>99.5% purity)
at site without the need for further refining or processing. 5
•
Kachi is targeting first lithium in 2027 with ramp-up to full capacity by the end of 2028, which
is forecast to coincide with the start of a prolonged period of structural deficit for battery
grade lithium chemicals.
Drillhole results prove the continuity of higher-grade lithium brines, south of the Phase One DFS
extraction wellfield design and across a northwest-southeast trending fault that is interpreted to
create the escarpment south of the field. The relatively high lithium and favourable geologic materials
grades beyond the planned DFS wellfield highlight continued favourable results for a higher capacity
wellfield.
“The latest drilling intercept further demonstrates the vertical continuity of the lithium bearing brine
to more than 600 metres in clean, fine and medium grained sands conducive to high productive
extraction wells.” commented Michael Gabora, Director of Geology and Hydrogeology of Lake
Resources. He continued, “With an average of 257 mg/L through the production zones, the K25D44
hole continues the trend of intercepting lithium grades that are significantly higher than the 205 mg/L
design basis of the DFS”.
All material assumptions underlying the production targets or exploration targets referenced in this
announcement can be found in the 19 December 2023 Lake Resources ASX Announcements Maiden Ore
Reserve Defined Lake Resources Flagship Kachi Project and Kachi Project Phase One Definitive Feasibility
Study. All material assumptions underpinning the production target and exploration target continue to apply
and have not materially changed since the date of the reports.
5
See 19 December 2023 Lake Resources ASX Announcement – Kachi Project Phase One Definitive Feasibility
Study
4
Figure 1: Lake Resources properties and drill platform locations highlighting recent and ongoing drilling
operations and most recent resource delineations 6 to 400 metres depth
See 22 November 2023 ASX announcement - Lake Resources JORC Update Increases Measured and Indicated
Resource by 250% for its Flagship Kachi Project
6
Figure 2: Lake Resources properties and drill platform locations highlighting recent and ongoing drilling
operations and most recent resource delineations 7 to 400 metres depth
Continuation of Higher-Grade Lithium Resource Intercepts to the South
The principal objectives of the K25D44 (K25 Platform) drillhole were to:
1) Test the continuity of the lithium resource to the south, outside of the footprint of the salar;
2) Expand the Measured Resource to the south and potentially connect the Measured Resource
to previous positive lithium intercepts at K21 (Figure 1);
See 22 November 2023 ASX announcement - Lake Resources JORC Update Increases Measured and Indicated
Resource by 250% for its Flagship Kachi Project
7
3) Complete additional sampling and analysis of the deeper portion of the unconsolidated
deposits from about 400 m to more than 600 m depth; and,
4) Validate lithium concentrations used in the area of K25 in the Ore Reserve analysis completed
with the calibrated hydrogeologic model.
K25D44 was drilled about 2.25 kilometres southwest of K16D28 (K16 Platform; Figure 1) and has an
average lithium grade of 219 mg/L from 19 samples collected between 40 and 622 m below ground
surface (bgs) (Table 1). All but two samples were collected with single packer configurations generally
with a test interval of about 10 to 15 m, although this varied depending on hole conditions. Standard
operating procedures are followed with significant development of the test interval, at least 3
borehole volumes (measured from surface to hole bottom), and sampling only occurs once brine is
clear and field chemistry parameters are stable and indicative of reservoir fluids.
A standpipe piezometer was installed and screened between 418 to 430 m bgs and was developed
and sampled via airlifting. Results for the airlift sample are consistent with the packer testing within
the same interval, with 275 mg/L measured by SGS and 248 mg/L measured by Alex Stewart
laboratory, for an average of 261 mg/L compared to 263.5 mg/L for a packer collected sample from
424 to 430 m bgs (see Table 1).
The fine to medium-grained sand (Figure 3 and Figure 4) and low frequency of fine-grained layers
within the planned production horizons (i.e., approximately 200 m to 600 m) are consistent with
drillholes in the central resource area and both stratigraphy and general chemistry support the
continuity of the lithium brine resource throughout the southern portion of the field.
As has been observed in the other greater than 600 m deep drillholes completed to-date, the lithium
brine continues to a depth of more than 600 m. Lithium concentrations deeper than 400 m averaged
more than 250 mg/L, far exceeding the design basis for the DFS (205 mg/L).
The modelled lithium concentration in the Project Ore Reserve 8 at K25 was 268 mg/L (200 m to 600
m) within the production horizon. The weighted average of the laboratory results through the same
interval (215 m to 622 m) is 271.7 mg/L. This indicates that the modelled values are representative, if
not slightly conservative, relative to the measured data in the field at this location. The results of the
comparison further build confidence in the lithium resource model used as the basis for lithium
distributions within the hydrogeological model and Ore Reserve modelling.
See 19 December 2023 Lake Resources ASX Announcement - Maiden Ore Reserve Defined Lake Resources
Flagship Kachi Project
8
Table 1. Lithium Intercepts drillhole K25D44
Test Well ID
K25
Average
40
50
Lithium
Concentration
(mg/L)
26.5
65
75
113.5
89
100
129.0
115
125
159.5
140.5
151.5
176.0
192.5
203.5
192.5
215
226
243.5
239
250
302.0
330
331
269.0
380
381
280.5
424
430
263.5
444
455
269.0
461
475
262.0
486
500
260.5
530
541
253.0
542
553
243.5
561
575
235.0
587
601
235.5
605
622
229.5
Sample Interval
(m bgs)
219
Laboratory
3SGS / AS
3SGS / AS
3SGS / AS
3SGS / AS
3SGS / AS
3SGS / AS
3SGS / AS
3SGS / AS
3SGS / AS
3SGS / AS
3SGS / AS
3SGS / AS
3SGS / AS
3SGS / AS
3SGS / AS
3SGS / AS
3SGS / AS
Average (Production
3SGS / AS
257
Zone, >200m depth)
Notes: 1SGS laboratory in Buenos Aires, Argentina; 2Alex Steward laboratory in Salta, Argentina;
3Average of both SGS laboratory in Buenos Aires, Argentina; 2 Alex Steward laboratory in Jujuy,
Argentina. Average values for hole rounded to nearest whole unit. Average of all samples from AS
was 226 mg/l and SGS was 210 mg/l, and sample results were in general reasonably consistent
between laboratories. Discrepancy exists for SGS sample from 40 to 50 m was <10 mg/L, while AS
result was 43 mg/L Li. The average of the non-detect, 10 mg/L (SGS), and 43 mg/L (AS ) was used in
the overall average, AS averaging used 43 mg/L and 10 mg/L was used in the averaging for SGS.
Some numbers may not match due to rounding errors.
Figure 3. Top – Drilling rig set up at K25D44; Upper right – fine grained sand sample typical of the
drillhole bgs; Lower right – fine grained sand from 606 m bgs
Figure 4. Lithology log from K25D44
Table 3 Updated resource estimate of contained lithium (November 9)
Measured November 2023 (to 400 m depth)
Unit
Sediment
Volume m3
Specific
Yield %
Brine volume
m3
Liters
Li
mg/L
Li grams
Li Tonnes
Tonnes LCE
A
11,001,000,000
0.078
858,078,000
858,078,000,000
210
179,783,644,000
180,000
956,000
B
4,366,100,000
0.081
352,090000
352,090,162,000
229
80,628,647,000
81,000
429,000
C
8,007,400,000
0.068
544,503,000
544,503,200,000
230
125,427,401,000
125,000
667,000
Fan West
8,833,000,000
0.095
839,135,000
839,135,000,000
220
184,609,700,000
185,000
982,000
Total
32,207,500,000
-
2,593,806,000
2,593,806,362,000
-
570,449,393,000
571,000
3,035,000
Indicated November 2023 to 600 m
Unit
Sediment
Volume m3
Specific
Yield %
Brine volume
m3
Liters
Li
mg/L
Li grams
Li Tonnes
Tonnes LCE
A (South)
3,694,300,000
0.076
278,924,000
278,924,452,000
181
50,485,326,000
50,000
269,000
B (South)
1,489,000,000
0.075
111,543,000
111,543,670,000
179
19,959,624,000
20,000
106,000
C (South)
4,382,400,000
0.067
294,407,000
294,407,879,000
182
53,582,234,000
54,000
285,000
A (North)
3,075,200,000
0.095
292,144,000
292,144,000,000
232
67,891,052,000
68,000
361,000
B (North)
4,294,400,000
0.095
407,968,000
407,968,000,000
241
98,166,484,000
98,000
522,000
C (North)
9,188,400,000
0.092
845,333,000
845,332,800,000
182
206,021,447,000
206,000
1,096,000
400 – 600m
12,230,170,000
0.066
806,922,000
806,922,156,000
242
195,275,162,000
195,000
1,039,000
400 – 600m
4,858,200,000
0.092
446,954,000
446,954,400,000
244
109,056,874,000
109,000
580,000
Total
43,212,070,000
3,484,197,000
3,484,197,358,000
800,438,203,000
800,000
4,258,000
1,370,887,596,000
1,371,000
7,293,000
Under Salar
West Fan Deep
Combined Measured and Indicated
75,419,570,000
6,078,004,000
6,078,003,721,000
Inferred November 2023
Unit
Sediment
Volume m3
Specific
Yield %
Brine volume
m3
Liters
Li
mg/L
Li grams
Li Tonnes
Tonnes LCE
A
4,756,500,000
0.080
378,325,000
378,325,351,000
185
69,975,435,000
70,000
372,000
B
1,671,300,000
0.079
131,198,000
131,197,886,000
191
25,101,960,000
25,000
134,000
C
5,287,600,000
0.074
393,746,000
393,746,422,000
218
85,950,119,000
86,000
457,000
Fan North
8,895,490,000
0.081
716,324,000
716,324,455,000
232
166,081,974,000
166,000
884,000
Fan South
12,248,490,000
0.064
781,249,000
781,249,112,000
239
186,718,538,000
187,000
993,000
Under volcano
6,718,700,000
0.074
500,471,000
500,471,260,000
192
96,334,211,000
96,000
512,000
Total
39,578,080,000
2,901,314,000
2,901,314,485,000
630,162,237,000
630,000
3,352,000
This table reproduces data from the 22 November 2023 ASX announcement - Lake Resources JORC Update
Increases Measured and Indicated Resource by 250% for its Flagship Kachi Project. There have been no
material changes since the date of this announcement.
9
•
•
•
•
•
•
JORC definitions were followed for Mineral resources.
The Competent Person for this Mineral Resource estimate is Andrew Fulton, MAIG.
No internal cut-off concentration has been applied to the resource estimate. The resource is reported at a 150
mg/L cut-off.
Some numbers do not add due to rounding.
Specific Yield (Sy) = Drainable Porosity.
Lithium is converted to lithium carbonate (Li2CO3) with a conversion factor of 5.32. For details on the lithology
units please refer to the DFS or resource / reserve.
Competent Person’s Statement – Kachi Lithium Brine Project
The information contained in this ASX release relating to Exploration Results is based on, and fairly represents,
information and supporting documentation that has been compiled by Mr Andrew Fulton. Mr Fulton is a
Hydrogeologist and a Member of the Australian Institute of Geoscientists and the Association of Hydrogeologists.
Mr Fulton has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a competent person as defined in the Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.
Andrew Fulton is an employee of Groundwater Exploration Services Pty Ltd and an independent consultant to Lake
Resources NL. Mr Fulton consents to the inclusion in this announcement of this information in the form and context in
which it appears. The information in this announcement is an accurate representation of the available data from
exploration at the Kachi project as reviewed by Mr. Fulton
_____________________________________________________________________________________________
JORC Table 1
This appendix provides all information that is material to understanding the exploration results in relation
to each of the criteria listed below.
Section 1
Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections.)
Criteria
Sampling
techniques
Section 1 – Sampling Techniques and Data
Drilling
techniques
Drill sample
recovery
Nature and quality of sampling
(e.g., cut channels, random chips,
or specific specialised industry
standard measurement tools
appropriate to the minerals under
investigation, such as down hole
gamma sondes, or handheld XRF
instruments, etc). These examples
should not be taken as limiting the
broad meaning of sampling.
Include reference to measures
taken to ensure sample
representivity and the appropriate
calibration of any measurement
tools or systems used.
Brine samples were taken from multiple sampling methods from
diamond core and rotary drilling methods including:
o
Bottom of hole spear point during HQ diamond core drilling
advance
o
Straddle and single packer device to obtain representative
samples of the formation fluid by purging a volume of fluid
from the isolated interval, to minimize the possibility of
contamination by drilling fluid then taking the sample. Low
pressure airlift tests are used as well. The fluid used for drilling
is brine sourced from the drill hole and the return from
drillhole passes back into the excavator dug pit, which is lined
with black plastic to avoid leakage. Single packer sampling is
the current standard form of sampling.
o
Installed standpipes with discrete screening intervals.
Bailer sampling during advance, removing significant brine
volumes to draw formation fluids into the base of the drill
stem.
Aspects of the determination of
mineralisation that are Material to
the Public Report.
o
In cases where ‘industry standard’
work has been done this would be
relatively simple (e.g. ‘reverse
circulation drilling was used to
obtain 1 m samples from which 3
kg was pulverised to produce a 30
g charge for fire assay’). In other
cases more explanation may be
required, such as where there is
coarse gold that has inherent
sampling problems. Unusual
commodities or mineralisation
types (e.g. submarine nodules)
may warrant disclosure of detailed
information.
Development of test wells and during pumping test of varying
durations.
Drill type (e.g. core, reverse
circulation, open-hole hammer,
rotary air blast, auger, Bangka,
sonic, etc) and details (e.g. core
diameter, triple or standard tube,
depth of diamond tails, facesampling bit or other type,
whether core is oriented and if so,
by what method, etc).
Diamond drilling with an internal (triple) tube was used for drilling.
The drilling produced cores with variable core recovery, associated
with unconsolidated material, in particularly sandy intervals.
Recovery of these more friable sediments is more difficult with
diamond drilling, as this material can be washed from the core
barrel during drilling.
Method of recording and
assessing core and chip sample
recoveries and results assessed.
Diamond drill core was recovered in 1.5 – 3m length intervals in the
drilling triple (split) tubes. Appropriate additives were used for hole
stability to maximize core recovery. The core recovered from each
run was measured and compared to the length of each run to
calculate the recovery. Chip samples are collected for each metre
The brine sample was collected in clean plastic bottles (1 litre) and
filled to the top to minimize air space within the bottle. Duplicate
samples were submitted at a high frequency, to allow statistical
evaluation of laboratory results. These were collected at the same
time as the primary samples for storage and submission of
duplicates to the laboratory. Each bottle was taped and marked
with the sample number.
Drill core in the hole was recovered in 1.5 m length core runs in
core lexan tubes to minimize sample disturbance.
Drill core was undertaken to obtain representative samples of the
sediments that host brine, being collected and stored in Lexan
Tubes, in order to collect samples that are as little disturbed as
possible.
Rotary drilling has used 8.5” or 10” tricone bits and has produced
drill chips, which have been logged and holes geophysically logged.
Brine has been used as drilling fluid for lubrication during drilling,
for mixing of additives and muds.
Logging
Measures taken to maximise
sample recovery and ensure
representative nature of the
samples.
drilled and stored in segmented plastic boxes for rotary drill holes.
Brine samples were collected at discrete depths during the drilling
using a double packer over variable intervals dependent on calliper
logs at interval between 1 - 6 m intervals (to isolate intervals of the
sediments and obtain samples from airlifting brine from the
sediment interval isolated between the packers) and single packer
configurations typically with 10 m intervals open at the base of the
hole. This equipment is from Geopro, a reputable international
supplier.
Additives and muds are used to maintain hole stability and
minimize sample washing away from the triple tube.
As the brine (mineralisation) samples are taken from inflows of the
brine into the hole (and not from the drill core – which has variable
recovery) they are largely independent of the quality (recovery) of
the core samples. However, the permeability of the lithologies
where samples are taken is related to the rate and potentially
lithium grade of brine inflows.
Whether core and chip samples
have been geologically and
geotechnically logged to a level of
detail to support appropriate
Mineral Resource estimation,
mining studies and metallurgical
studies.
Sand, clay, silt, and minor occurrences of ignimbrite were
recovered in a triple tube diamond core drill tube, or as chip
samples from rotary drill holes, and examined for geologic logging
by a geologist and a photo taken for reference.
Whether a relationship exists
between sample recovery and
grade and whether sample bias
may have occurred due to
preferential loss/gain of
fine/coarse material.
Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc)
photography.
The total length and percentage of
the relevant intersections logged.
Sub-sampling
techniques and
sample
preparation
If core, whether cut or sawn and
whether quarter, half or all core
taken.
For all sample types, the nature,
quality and appropriateness of the
sample preparation technique.
Quality control procedures
adopted for all sub-sampling
stages to maximise representivity
of samples.
Measures taken to ensure that the
sampling is representative of the
in-situ material collected,
including for instance results for
field duplicate/second-half
sampling.
If non-core, whether riffled, tube
sampled, rotary split, etc and
whether sampled wet or dry.
Diamond holes are logged by a geologist who also supervised taking
of samples for laboratory porosity analysis (with samples drilled
and collected in lexan polycarbonate tubes) as well as additional
physical property testing.
Logging is both qualitative and quantitative in nature. The relative
proportions of different lithologies which have a direct bearing on
the overall porosity, contained and potentially extractable brine are
noted, as are more qualitative characteristics such as the
sedimentary facies and their relationships. Cores are photographed
for reference, prior to storage.
Brine samples were collected by inflatable packer, bailer and spear
sampling methods, over a variable interval. Low pressure airlift
tests are used as well to purge test interval and gauge potential
yields (brine flows). Samples have also been collected during
development of piezometers and test wells and during pumping
tests of variable durations.
The brine sample was collected in one-litre sample bottles, rinsed
and filled with brine. Each bottle was taped and marked with the
sample number. Duplicates were taken and submitted with
standards as part of the QA/QC protocols.
Quality of assay
data and
laboratory tests
Verification of
sampling and
assaying
The nature, quality and
appropriateness of the assaying
and laboratory procedures used
and whether the technique is
considered partial or total.
For geophysical tools,
spectrometers, handheld XRF
instruments, etc, the parameters
used in determining the analysis
including instrument make and
model, reading times, calibrations
factors applied and their
derivation, etc.
Nature of quality control
procedures adopted (e.g.
standards, blanks, duplicates,
external laboratory checks) and
whether acceptable levels of
accuracy (i.e. lack of bias) and
precision have been established.
The verification of significant
intersections by either
independent or alternative
company personnel.
The use of twinned holes.
Documentation of primary data,
data entry procedures, data
verification, data storage (physical
and electronic) protocols.
Discuss any adjustment to assay
data.
Location of data
points
Data spacing
and distribution
Whether sample sizes are
appropriate to the grain size of the
material being sampled.
Specification of the grid system
used.
Quality and adequacy of
topographic control.
Data spacing for reporting of
Exploration Results.
The quality control and analytical procedures used at the Alex
Stewart laboratory or SGS laboratory are considered to be of high
quality and comparable to those employed by ISO certified
laboratories specializing in analysis of brines and inorganic salts.
QA/QC samples include field duplicates, standards and blank
samples.
Field duplicates, standards and blanks will be used to monitor
potential contamination of samples and the repeatability of
analyses. Accuracy, the closeness of measurements to the “true” or
accepted value, has been monitored by the insertion of standards,
or reference samples, and by check analysis at an independent (or
umpire) laboratory.
Duplicate samples in the analysis chain were submitted to Alex
Stewart or SGS laboratories as unique samples (blind duplicates)
during the process.
Stable blank samples (distilled water) were used to evaluate
potential sample contamination and will be inserted in future to
measure any potential cross contamination.
Samples were analysed for conductivity using a hand-held Hanna
pH/EC multiprobe on site, to collect field parameters.
Regular calibration of the field equipment using standards and
buffers is being undertaken.
Accuracy and quality of surveys
used to locate drill holes (collar
and down-hole surveys), trenches,
mine workings and other locations
used in Mineral Resource
estimation.
Analytical laboratory services are currently split between Alex
Stewart International Argentina Jujuy, Argentina, and SGS
laboratory in Buenos Aires has also been used for both primary and
check samples. They also analysed blind control samples and
duplicates in the analysis chain. The Alex Stewart laboratory and
the SGS laboratory are ISO 9001 and ISO 14001 certified and are
specialized in the chemical analysis of brines and inorganic salts,
with experience in this field. This includes the oversight of the
experienced Alex Stewart Argentina S.A. laboratory in Mendoza,
Argentina, which has been operating for a considerable period.
The diamond drill hole sample sites and rotary drill hole sites were
located with a hand-held GPS and later located by a surveyor, with
the majority of hole collars defined by the surveyor.
The properties are located at the junction of the Argentine POSGAR
grid system Zone 2 and Zone 3 (within UTM 19) and in WGS84 Zone
19 south. The Project is using Zone 2 as the reference zone, as the
critical infrastructure is located on the edge of Zone 2.
Drill holes in the central area where Measured resources have been
defined have a spacing of approximately 1.5 km between drill
Whether the data spacing, and
distribution is sufficient to
establish the degree of geological
and grade continuity appropriate
for the Mineral Resource and Ore
Reserve estimation procedure(s)
and classifications applied.
Whether sample compositing has
been applied.
Orientation of
data in relation
to geological
structure
Sample security
Review (and
Audit)
Whether the orientation of
sampling achieves unbiased
sampling of possible structures
and the extent to which this is
known, considering the deposit
type.
Compositing has been applied to porosity data obtained from the
BMR geophysical tool, as data is collected at closer than 10 cm
intervals, providing extensive data, particularly compared to the
available assay data.
The salt lake (salar) deposits that contain lithium-bearing brines
generally have horizontal to sub-horizontal beds and lenses that
contain sand, gravel, salt, silt and clay. The vertical diamond drill
and rotary holes provide the best understanding of the stratigraphy
and the nature of the sub-surface brine bearing aquifers.
Geological structures are important for the formation of salar
basins, but not as a host to brine mineralization.
Samples were transported to the Alex Stewart/Norlab SA or SGS
laboratories for chemical analysis in sealed 1-litre rigid plastic
bottles with sample numbers clearly identified. Samples were
transported by a trusted member of the team to the office in
Catamarca and then sent by DHL couriers to the laboratories.
The samples were moved from the drillhole sample site to secure
storage at the camp on a daily basis. All brine sample bottles sent
to the laboratory are marked with a unique label.
An audit of the database has been conducted by the CP and
another Senior Consultant at different times during the Project and
prior to finalization of the samples to be used in the resource
estimate. The CP has been onsite periodically during the sampling
program. The review included drilling practice, geological logging,
sampling methodologies for brine quality analysis and, physical
property testing from drill core, QA/QC control measures and data
management. The practices being undertaken were ascertained to
be appropriate, with constant review of the database by
independent personnel recommended. Additionally, an external
review of field sampling procedures and data collection was
undertaken by Geoff Baldwin in April 2023. An external peer review
of the November 2023 resource update was performed by John
Houston.
If the relationship between the
drilling orientation and the
orientation of key mineralised
structures is considered to have
introduced a sampling bias, this
should be assessed and reported if
material.
The measures taken to ensure
sample security.
The results of any audits or
reviews of sampling techniques
and data.
holes, with a greater spacing in the area where Inferred resources
have been defined.
Brine samples were generally collected over various intervals using
straddle packers, single packers, spear points, and discrete screen
intervals from installed piezometers with samples collected at
variable intervals vert