IMARC Presentation
Released
Released
Announcement PDF
Mines and Money
Mining Spotlight
31 October 2023
2
Disclaimer
General Statement and Cautionary Statement
This presentation has been prepared by Lake Resources N.L (Lake) for information purposes and meetings with sophisticated and professional investors, institutional investors and brokers and not any particular party. The information
in this presentation is based upon public information and internally developed data and reflects prevailing conditions and views as of this date, all of which are accordingly subject to change. The information contained in this
presentation is of general nature and is not intended to address the circumstances of any particular individual or entity. There is no guarantee that the information is accurate as of the date it is received or that it will continue to be
accurate in the future. No warranties or representations can be made as to the origin, validity, accuracy, completeness, currency or reliability of the information. No one should act upon such information without appropriate
professional advice after a thorough examination of the particular situation. Lake Resources NL accepts no responsibility or liability to any party in connection with this information or views and Lake disclaims and excludes all liability
(to the extent permitted by law) for losses, claims, damages, demands, costs and expenses of whatever nature arising in any way out of or in connection with the information, its accuracy, completeness or by reason of reliance by any
person on any of it. The information regarding projects described in this presentation are based on exploration targets, apart from the Kachi project’s resource statement. The potential quantity and grade of an exploration target is
conceptual in nature, with insufficient exploration to determine a mineral resource and there is no certainty that further exploration work will result in the determination of mineral resources or that potentially economic quantities of
lithium will be discovered. Some leases are located within and around the Orocobre, Orocobre/Advantage Lithium and Ganfeng/Lithium Americas projects and although data is limited within the properties, the leases may cover
potential extensions to the Cauchari/Olaroz projects with potential extensions to aquifers, although this provides no assurance that any resource will be identified on the Lake leases. The lithium pegmatite leases occur adjacent to
past producers of spodumene but no potential extension to any mineralisation can be assured.
Forward Looking Statements
Certain statements contained in this presentation, including information as to the future financial performance of the projects, are forward-looking statements. Such forward-looking statements are necessarily based upon a number
of estimates and assumptions that, while considered reasonable by Lake Resources N.L. are inherently subject to significant technical, business, economic, competitive, political and social uncertainties and contingencies; involve
known and unknown risks and uncertainties and other factors that could cause actual events or results to differ materially from estimated or anticipated events or results, expressed or implied, reflected in such forward-looking
statements; and may include, among other things, statements regarding targets, estimates and assumptions in respect of production and prices, operating costs and results, capital expenditures, reserves and resources and
anticipated flow rates, and are or may be based on assumptions and estimates related to future technical, economic, market, political, social and other conditions and affected by the risk of further changes in government regulations,
policies or legislation and that further funding may be required, but unavailable, for the ongoing development of Lake’s projects. Lake Resources N.L. disclaims any intent or obligation to update any forward-looking statements,
whether as a result of new information, future events or results or otherwise. The words “believe”, “expect”, “anticipate”, “indicate”, “contemplate”, “target”, “plan”, “intends”, “continue”, “budget”, “estimate”, “may”, “will”,
“schedule” and similar expressions identify forward-looking statements. All forward-looking statements made in this announcement are qualified by the foregoing cautionary statements. Investors are cautioned that forward-looking
statements are not guarantees of future performance and accordingly investors are cautioned not to put undue reliance on forward-looking statements due to the inherent uncertainty therein. Lake does not undertake to update any
forward-looking information, except in accordance with applicable securities laws.
Compliance Statement
The information contained in this presentation relating to financial forecasts, production targets, exploration results, Measured, Indicated and Inferred resource estimates, project execution, infrastructure and testing work, has been
derived from the information in Lake’s JORC update announced on ASX on 15 June 2023. Lake Resources N.L. confirms that it is not aware of any information that materially affects the information included in Lake’s JORC update
announced on ASX on 15 June 2023 and all material assumptions contained in that announcement continue to apply and have not materially changed. On this basis, Lake confirms that the Competent Person’s findings in Lake’s JORC
update announced on ASX on 15 June 2023 have not changed nor been modified in any material respects since that announcement.
Kachi Project
5
Argentina’s Significant Lithium Assets
Argentina is an attractive location for lithium investment on a global scale, not only due to its vast lithium resource
base, but also given the supportive regulatory and legal environment. Lake is well positioned to optimize its lithium
assets, resources and relationships in Argentina
Kachi – Lake’s Flagship Project
■ Located in Catamarca region, within the Lithium Triangle which holds ~56%
of the world’s lithium reserves1
■ Government is committed to speedily developing the country’s lithium
resources, with investments in Argentina’s lithium sector
■ Strong relationship with the provincial government of Catamarca
Notes:
1.
US Geological Survey (USGS)
6
Kachi Fact Sheet
Location
Catamarca Province, Argentina
Project Stage
Completion of Phase 1 Definitive Feasibility Study (DFS) targeted for December 2023
Products
Battery Grade Lithium Carbonate
Measured & Indicated Resources2
2.9 million tonnes Lithium Carbonate Equivalent (LCE)
Inferred Resources2
5.2 million tonnes LCE
Project Execution Approach3
50,000 tonnes per annum target plant capacity
• Phase 1 – 25,000 target plant capacity
• Phase 2 – Additional 25,000 target plant capacity
Non-Binding Offtake Agreements
100% of Lithium Carbonate production
Mine Life1
25 years
Notes:
1. Not DFS estimates. Mine life for the reserve will be confirmed with the DFS;
refer to 19 June 2023 ASX announcement
2. See JORC release on the 15th of June 2023; please refer to Appendix A for
additional information.
3. These figures refer to target plant capacity only and are not production
targets, nor predictions of what the plant will produce. Further information
will be available upon completion of the Phase 1 DFS.
A year of progress, preparing Kachi for project execution
Clear parallels between DLE and oil & gas projects in developing Kachi
CEO appointment
Sept 2022
9
Recruiting leading management, technical
and operations team to build world class
development plan. New Board members
appointed.1
Oct 2022 – Feb 2023
Tpa = tonnes per annum
DFS = Definitive Feasibility Study
1. Refer to ASX announcement dated 12 January 2023
2. Refer to ASX announcement dated 19 June 2023
3. 50,000 tpa target plant capacity made up of Phase 1 (25,000 tpa) + Phase 2
(25,000 tpa)
4. When first train (12,500 tpa) in Phase 1 commences operation
Announcement of de-risked project plan
• 50,000 tpa target plant capacity achieved in 2x25,000
tpa phases3
- Each phase made of two trains 12,500 tpa
- Brine to battery grade Li2CO3 from Demo plant
• Commercial Li2CO3 production targeting Q3 20274
• Phase 1 full operations targeting Q4 2028
• Phase 1 DFS completion Dec. 2023
Feb 2023 – May 2023
Experienced EPC team delivers
productivity and efficiency gains and
bankable path to DFS
June 20232
Substantial Resources With Embedded Upside
Kachi is a large-scale lithium carbonate project with significant LCE resource and further expansion potential
Large-Scale Lithium Carbonate Project
Substantial Expansion and Exploration Potential
Li (Kt)
LCE (Kt)
Grade
(mg / l)
Measured
416
2,211
210
Indicated
135
716
174
M&I
550
2,926
200
Inferred
974
5,183
199
Resources (in Million Tonnes LCE)
8.1
4.4
3.4
1.0
2018
5.3
5.2
3.1
2.9
2.2
Jan-23
Measured & Indicated
Jun-23
Inferred
Source: Lake Resources 15 June 2023 JORC update on Project Kachi. and data has not materially changed since that date. Please refer to
Appendix A for additional information.
n Measured and Indicated (M&I) resources have increased from
2.2Mt in Jan-23 to 2.9Mt in Jun-23 of LCE defined, to a depth of
400m over 106km
n Surrounding the M&I resources are Inferred Resources of 5.2Mt
LCE defined over 161km
— The resource remains open to depths over 600m below ground
surface (bgs) and open laterally, where drilling is underway to
better define the resource extent
n The footprint of the Inferred Resource has expanded substantially
north and south from recent characterization activities and
transient electromagnetic geophysics suggests the lithium brine
may extend significantly further indicating substantial additional
exploration potential
n Current and future drilling is targeting additional step out holes
and defining the deeper resource beyond 400m bgs
DLE Process Proven
Process flow sheet proven from brine
to battery grade lithium carbonate
1. Extraction Brine Buffer Pond1
2. Depleted Brine Buffer Pond1
3. Lilac Ion Exchange
4. Carbonation and Product Storage
5. Chlor-Alkali & Reagents
Major Milestones Achieved in
Kachi Demonstration Plant using
Lilac DLE Technology
DLE demonstration plant continuously operational for
more than 2,500 hours with 90% uptime
Highly selective process with consistent results on sample
testing
> 90% impurity removal3
> 80%2 lithium recovery3
Produced 200,000 liters of eluate containing more than
4,100 kg of LCE
Lithium Carbonate exceeds battery grade requirements >
99.8% purity3
Initial offtake samples shipped
1
Buffer pond size for our target 50Ktpa plant capacity is more than 100x smaller than evaporation ponds required for same output. 2 For DLE recovery only; >76% for total plant.
3 Refer to ASX Announcements on 3 April 2023, 19 June 2023 and 26 September 2023
Project Execution and Next steps
■ 30-day pumping test complete; reviewing data to incorporate learnings into future well designs
■ Process design plant finalized
■ Ongoing conversations with Export Credit Agencies in the UK and Canada, bankers and offtake
partners
■ Working with strategic advisors on:
■ Near term Capital requirements
■ Project financing structure
■ Resource and reserve for Phase 1 DFS are undergoing review processes; we will release updates to
the market in the coming weeks as required, as a result of that review
■ Finalize power design and selection of Independent Power Producer (IPP)
On target for completion of Phase 1 DFS in December 2023
15
Appendix A
10
Note: This table has been directly extracted from
the JORC update announced on 15 June 2023. Lake
Resources N.L. confirms that it is not aware of any
information that materially affects the information
included in Lake’s JORC update announced on ASX
on 15 June 2023 and all material assumptions
contained in that announcement continue to apply
and have not materially changed.
11
Mines and Money
Mining Spotlight
31 October 2023