Update- Successful Extraction and Injection Tests at Kachi
Released
Released
Announcement PDF
ASX ANNOUNCEMENT
August 16 2023
UPDATE: Lake re-issues its announcement from yesterday dated August 15, 2023 ‘Lake
Resources Completes Intermediate Milestone to Achieve DFS with Successful Extraction and
Injection Tests at its Flagship Kachi Project’ to include the table of individual categories of
mineral resource information at Annexure 1, which has not changed since it was first released
on June 15, 2023.
Lake Resources Completes Intermediate Milestone to Achieve DFS with
Successful Extraction and Injection Tests at its Flagship Kachi Project
•
Successful Stage 1 extraction and injection test campaign completed.
•
Pumping tests confirm favourable hydrogeologic conditions for brine extraction.
•
Injection trials successfully demonstrated spent brine disposal capability.
•
33 million liters of brine injected into the reservoir.
•
Brine chemistry samples shows improved lithium concentration.
•
Next step includes detailed wellfield and injection design in support of the DFS
•
First successful salar brine injection test in Catamarca.
Clean lithium developer Lake Resources NL (ASX: LKE; OTC: LLKKF) (“LAKE” or “the Company”)
announces successful testing that has proved the concept of extraction and injection to support the
production of high purity battery grade lithium carbonate at the Kachi lithium brine Project (“Kachi”
or the “Project”) in Catamarca Province, Argentina.
“The extraction and injection testing confirms highly favourable reservoir hydraulic properties and
allows us to optimise the future wellfield,” Lake CEO David Dickson said.
“The tests represent a significant milestone for the Project, as they provide important data and
higher confidence for our modelling, which is essential for the completion of our DFS for Phase 1.
The results are indicative of high-yield, production-scale, extraction wells in the core resource area.”
“Partners, offtakers and future buyers will demand sustainable lithium supply and Kachi is essential
to meet this need.”
Lake last updated its resource with a 53 percent increase in resources at Kachi with Measured,
Indicated and Inferred increasing from 5.29 Million Tons (Mt) to more than 8.1 Mt of battery grade
Lithium Carbonate Equivalent (LCE) 1. The mineral resources last reported on June 15, 2023 have not
materially changed since that date. 2
Michael Gabora, Director of Geology and Hydrogeology for Lake Resources, said “the injection tests
June 15 2023 ASX announcement - Lake Resources Provides JORC Update on its Flagship Kachi Project
See Annexure 1 for details of the individual categories of ‘Inferred’, ‘Indicated’ and ‘Measured’ regarding the
JORC Mineral Resource estimate, which was first reported in the announcement on June 15, 2023 and has not
changed since that date.
1
2
demonstrated the suitability of the reservoir for injection and bulk brine samples indicated that
exploration sampling results were conservative.”
“The positive results of this testing now allow for design of scaled up production and injection wells
for the next stage of testing and production wellfield design”.
The Kachi Project has shown continual increases in mineral resource estimates since the maiden
estimate of 4.4 Mt of contained LCE in Inferred and Indicated categories was announced in November
2018 3 . The resource was significantly upgraded in January 2023 with a Measured and Indicated
resource of 2.2 Mt and 3.1 Mt of Inferred mineral resources 4. The total resource was again increased
in June of 2023 with more than 2.9 Mt LCE in Measured and Indicated and 5.3 Mt in the Inferred
category for a total resource estimate of more than 8.1 Mt1. The testing detailed in this announcement
provides positive results related to the recoverability of these extensive lithium brine resources. 5
Completion of high-volume tests
The primary objectives of the extraction and injection tests were three-fold:
1) quantify hydraulic properties of the reservoir controlling well production / injection rates;
2) test the viability of injecting into the core resource area reservoir; and,
3) develop a robust dataset to support hydrogeologic modelling that will be used for wellfield
design and reserve estimation.
Pumping and re-injection tests have successfully been completed in two test wells, KB and KC, located
in the central portion of the resource area (Figure 1). These pumping tests provide key data for
hydrogeological models which are used to model the extraction and injection wellfields for the
commercial operation.
The KB and KC pumping tests resulted in high transmissivity (the hydraulic conductivity x reservoir
thickness) estimates of 145 m2/d and 156 m2/d, respectively.
These transmissivities extrapolate to high projected flow rates in larger diameter production scale
wells, with longer intervals of screens, through which brine can be extracted, or in different locations
where spent brine can be injected outside the production area .
Brine extracted from KC was injected into KB. The pumping extraction and reinjection order was then
reversed, as this minimised requirements for tanks and brine storage at surface when pumping from
the extraction to injection wells (Figure 1). Minimal interaction was interpreted in the subsurface at
the wells from the pumping and reinjection (i.e., minimal well interference) during the test periods.
Testing resulted in more than 14-million litres injected at KC and over 19 million litres injected at KB
for a total of over 33 million litres of water successfully injected during the testing period.
November 27 2018 ASX announcement - Maiden 4.4 Mt Resource Estimate – Kachi Lithum Brine Project
January 11 2023 ASX announcement - Kachi M&I resource doubled to 2.2 million tonnes Lithium Carbonate
Equivalent with 3.1 million tonnes Inferred resource
5
This announcement reports testing results only. No exploration or production targets, nor new estimates of
inferred mineral resources, indicated mineral resources or measured mineral resources in relation to the Kachi
Project are being reported in this announcement, and the mineral resources last reported in the
announcement on June 15, 2023 have not materially changed since that date.
3
4
The successful injection demonstrates the viability of injection in the core resource area and
confidence that injection is also possible in geologically more favourable areas outside of the salar
core.
The tests represent the first successful salar injection test in Catamarca known to the Company.
The data collected during these tests are being used in the development of the hydrogeologic model
that will be applied to simulate and optimise the extraction and injection wellfields.
Of the twenty-five samples collected from the two test wells, the average lithium concentration was
263 milligrams per litre (mg/L).
Extraction testing indicates the reservoir is highly productive.
Injecting into the core resource area provided a mechanism to evaluate brine disposal, utilising the
same wells from which brine pumping tests were conducted. This provided a cost-effective way of
defining hydraulic parameters related to both pumping extraction and injection and also allowed Lake
to prove out the concepts around injection and provided additional data for ongoing technical design.
Subsequent injection testing will be undertaken in the primary areas targeted for injection, south of
the core resource area.
Each test well platform (Figure 1) was equipped with a test well in the Unit B reservoir, a monitoring
well in Unit B and additional monitoring wells in Units A (overlying) and Unit C (underlying) to evaluate
the vertical connectivity in the hydrogeologic system.
Figure 1. Location of test wells KB and KC and platform observation piezometers
Design of tests
Test wells KB and KC (see Figure 1) were designed to provide information on hydraulic parameters
and flow rates.
The positive results of this testing now allow for design of scaled up production and injection wells for
the next stage of testing and production wellfield design.
The tests significantly improve our understanding of the reservoir and provide data to support
hydrogeological model development.
The tests represent a landmark achievement for the Project. The excellent results are indicative of
high-yield, production-scale, extraction wells in the core resource area.
The extraction and injection testing was completed on KB and KC, with short-screened test wells that
are screened from 200 to 255 m bgs and 200 to 254 m bgs, respectively (Table 1). These wells are
completed within the fine sands of the Unit B reservoir (refer to Lake’s June 15, 2023 ASX
announcement for detailed lithological descriptions). To test different, locally available materials, KB
was constructed of pre-pack well screen, in which a 5-inch diameter screen was enveloped with filter
pack to a diameter of 7-inches. KC is a more conventionally completed 6-inch diameter screened well
with a gravel pack emplaced from surface.
Prior to initiating the tests, the wells were developed by air lifting and jetting, and subsequently with
a submersible pump. Both short-term step-rate tests and constant-rate tests were completed at each
well, with the latter used to aid in selecting optimal rates for the longer-term constant-rate tests
described in this update.
Table 1. Constant rate pumping test details
Test
Well
ID
Screen
Interval
(m bgs)
Screen
Diameter
(in)
Test
Duration
(days)
Average
Pumping
Rate
(lps)
Maximum
Drawdown in
Pumping Well
(m)
Average Li
Concentration
(mg/L)
Number of Lithium
Samples Collected
During the Test
Unit
Tested
KB
200 - 255
5
12
16.0
65.1
263.2
20
Unit B
KC
200 - 254
6
15
24.5
32.9
262.0
5
Unit B
Well KB is less efficient than KC. This was attributed to the relatively angular gravel pack material used
in the pre-pack well screen. Well KB had more groundwater-level drawdown (drawdown) as a result.
The KC pumping test was completed after 15 days. The specific capacity at KC was measured as 0.85
lps/m and this extrapolates to high production rates given the short 54-m screen interval used for
testing. The production wells are expected to have 150 to 200-m of screen. The KB extraction test was
completed after 12 days. Both tests demonstrate that the reservoir is transmissive and permeable
(Table 2) and are indicative of high-yielding production wells for extracting lithium brine.
Table 2 Calculated hydraulic properties of the Unit B reservoir
Test Well
ID
Transmissivity
(m2/d)
Hydraulic
Conductivity
(m/d)
Specific
Storage
(1/m)
Average
Specific
Capacity
(lps/m)
Available
Drawdown3
(m)
Observation Well /
Maximum
Drawdown (m)
KB
113.3
2.1
3.3 x 10-5
0.28
154
K11R26B / 3.5
KC
190.1
3.5
4.6 x 10-6
0.85
154
K12D21 / 7.9
Notes:
1All tests analyzed using the Hantush Jacob method 6 and reported values are from the observation wells
2 Results presented are based on the observation well responses for the observation well on the same platform and
represent an average result from both the pumping and recovery data.
3 Calculated as the distance between the depth to the top of the pump and the depth to brine.
Lithium Concentration in Extracted Brine
6
Hantush, M.S., 1961a. Drawdown around a partially penetrating well, Jour. of the Hyd. Div., Proc. of the Am. Soc. of Civil
Eng., vol. 87, no. HY4, pp. 83-98. and Hantush, M.S., 1961b. Aquifer tests on partially penetrating wells, Jour. of the Hyd.
Div., Proc. of the Am. Soc. of Civil Eng., vol. 87, no. HY5, pp. 171-194.
Brine chemistry samples were collected from KB and KC at the end of well development and during
testing. The average lithium concentrations of these samples were 263.2 mg/L (twenty samples) and
262.0 mg/L (five samples) for KB and KC, respectively.
This has improved the Lithium concentration signature from the screened intervals (200-250 m) from
the exploration drilling phase sampling of 223.5 mg/l Li for KB and 223.0 mg/l Li for KC. This will have
some impact on future resource calculations within Unit B of the measured resource volume footprint
of shown in Figure 2.
Test wells KB and KC have provided bulk geochemical sampling from the screened intervals, which
indicates the results obtained from exploration drilling at these platforms were conservative.
Figure 2 Lake Resources properties and drill platform locations highlighting recent and ongoing drilling
operations and most recent resource delineations 7
7
June 15 2023 ASX announcement - Lake Resources Provides JORC Update on its Flagship Kachi Project
Successful Injection Tests
A key element of the Kachi Project is the injection of spent brine into the subsurface during operations,
resulting in very limited net impact to the water balance of the Carachi Basin.
The two injection tests resulted in the successful injection of more than 33 million litres of brine into
the core resource area using test wells KB and KC (Figure 3).
The test wells were principally designed as extraction wells but were used for the dual purpose of
extraction and injection in the Stage I testing program.
Production-scale injection wells with longer well screens will have significantly higher injectivity rates.
Additionally, while there may be some injection wells in the core resource area, most injection is
planned to occur outside of this area, where geologic materials are coarser and more permeable.
Completion of the Stage I injection testing program, consisting of more than 27 total days of injection,
is a major milestone for the Project.
Figure 3. Photo of the injection test configuration at KB
During these tests, brine was initially discharged to an open-air storage tank and then pumped to the
injection well. A portion of the KC flow was discharged to the salar, in addition to being injected at KB,
for the first 12 days of the test. A summary of the test results is provided below:
Table 3 Summary of injection test results
Test Well Used for
Injection
Total Volume
Injected
(millions of
liters)
Average Injection
Rate (lps)
Average Specific
Injectivity (lps/psi)
KB
19.0
14.4
0.13
KC
14.1
13.6
0.19
The KB specific injectivity was reasonably constant during the test period. For the KC test, there was
some decline in specific injectivity throughout the test period. This was potentially associated with the
introduction of air after a brief shutdown period, and/or entrainment of halite precipitate in the open
tank. Test procedures and infrastructure are being refined for future tests to evaluate different depth
horizons and/or areas of the concessions.
Additional extraction and injection trials are ongoing to refine our understanding of the subsurface
and brine geochemistry. Infill drilling in the southern region of the Project area is occurring now at K24
(K24D41) and at K25 (K25D42) (Figure 2) and has recently been completed at K23 (K23D40) northwest
of the core resource area.
Subsequent additional aquifer testing is underway at Kachi. This data will be used as input for the
hydrogeologic model being developed to simulate the extraction and injection wellfields as part of the
Project’s Definitive Feasibility Study (DFS) for Phase 1 and to support development of a reserve
estimate for the Project.
Competent Person’s Statement – Kachi Lithium Brine Project
The information contained in this ASX release relating to Exploration Results is based on, and fairly represents,
information and supporting documentation that has been compiled by Mr Andrew Fulton. Mr Fulton is a
Hydrogeologist and a Member of the Australian Institute of Geoscientists and the Association of Hydrogeologists.
Mr Fulton has sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a competent person as defined in the Australasian
Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.
Andrew Fulton is an employee of Groundwater Exploration Services Pty Ltd and an independent consultant to Lake
Resources NL. Mr Fulton consents to the inclusion in this announcement of this information in the form and context
in which it appears. The information in this announcement is an accurate representation of the available data from
initial exploration at the Kachi project as prepared by Mr Fulton .
JORC Table 1
This appendix provides all information that is material to understanding the exploration results in relation to each of the criteria listed
below.
Section 1
Sampling Techniques and Data related to Kachi drilling
(Criteria in this section apply to all succeeding sections.)
Criteria
Sampling
techniques
Section 1–- Sampling Techniques and Data
Nature and quality of sampling
(e.g., cut channels, random chips, or
specific specialised industry
standard measurement tools
appropriate to the minerals under
investigation, such as down hole
gamma sondes, or handheld XRF
instruments, etc). These examples
should not be taken as limiting the
broad meaning of sampling.
Include reference to measures taken
to ensure sample representivity and
the appropriate calibration of any
measurement tools or systems
used.
Aspects of the determination of
mineralisation that are Material to
the Public Report.
In cases where ‘industry standard’
work has been done this would be
relatively simple (e.g. ‘reverse
circulation drilling was used to
obtain 1 m samples from which 3 kg
was pulverised to produce a 30 g
charge for fire assay’). In other
cases more explanation may be
required, such as where there is
coarse gold that has inherent
sampling problems. Unusual
commodities or mineralisation types
(e.g. submarine nodules) may
warrant disclosure of detailed
information.
•
•
•
•
Drilling
techniques
•
Drill type (e.g. core, reverse
circulation, open-hole hammer,
rotary air blast, auger, Bangka,
sonic, etc) and details (e.g. core
diameter, triple or standard tube,
depth of diamond tails, facesampling bit or other type,
whether core is oriented and if so,
by what method, etc).
•
•
•
•
•
•
•
Drill sample
recovery
•
•
Method of recording and assessing
core and chip sample recoveries and
results assessed.
Measures taken to maximise
•
Brine samples were taken from multiple sampling methods
from diamond core and rotary drilling methods including:
o
bottom of hole spear point during HQ diamond core
drilling advance
o straddle packer device to obtain representative
samples of the formation fluid by purging a volume of
fluid from the isolated interval, to minimize the
possibility of contamination by drilling fluid then
taking the sample. Low pressure airlift tests are used
as well. The fluid used for drilling is brine sourced from
the drill hole and the return from drillhole passes back
into the excavator dug pit, which is lined with black
plastic to avoid leakage. Straddle packer sampling is
the current standard form of sampling.
o Installed standpipes with discrete screening intervals
o Bailer sampling during advance, removing significant
brine volumes to draw formation fluids into the base
of the drill stem
The brine sample was collected in clean plastic bottles (1 litre)
and filled to the top to minimize air space within the bottle.
Duplicate samples were submitted at a high frequency, to
allow statistical evaluation of laboratory results. These were
collected at the same time as the primary samples for storage
and submission of duplicates to the laboratory. Each bottle
was taped and marked with the sample number.
Drill core in the hole was recovered in 1.5 m length core runs
in core split tubes to minimize sample disturbance.
Drill core was undertaken to obtain representative samples of
the sediments that host brine, being collected and stored in
Lexan Tubes, in order to collect samples that are as little
disturbed as possible.
Diamond drilling with an internal (triple) tube was used for
drilling. The drilling produced cores with variable core
recovery, associated with unconsolidated material, in
particularly sandy intervals. Recovery of these more friable
sediments is more difficult with diamond drilling, as this
material can be washed from the core barrel during drilling.
Rotary drilling has used 8.5” or 10” tricone bits and has
produced drill chips, which have been logged and holes
geophysically logged.
Brine has been used as drilling fluid for lubrication during
drilling, for mixing of additives and muds.
Diamond drill core was recovered in 1.5m length intervals in
the drilling triple (split) tubes. Appropriate additives were used
for hole stability to maximize core recovery. The core
recovered from each run was measured and compared to the
sample recovery and ensure
representative nature of the
samples.
Whether a relationship exists
between sample recovery and grade
and whether sample bias may have
occurred due to preferential
loss/gain of fine/coarse material.
•
•
•
•
Logging
Whether core and chip samples
have been geologically and
geotechnically logged to a level of
detail to support appropriate
Mineral Resource estimation,
mining studies and metallurgical
studies.
Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of
the relevant intersections logged.
•
•
•
Sub-sampling
techniques
and sample
preparation
If core, whether cut or sawn and
whether quarter, half or all core
taken.
If non-core, whether riffled, tube
sampled, rotary split, etc and
whether sampled wet or dry.
For all sample types, the nature,
quality and appropriateness of the
sample preparation technique.
Quality control procedures adopted
for all sub-sampling stages to
maximise representivity of samples.
Measures taken to ensure that the
sampling is representative of the insitu material collected, including for
instance results for field
duplicate/second-half sampling.
•
•
•
•
•
•
Whether sample sizes are
appropriate to the grain size of the
material being sampled.
•
•
•
•
•
length of each run to calculate the recovery. Chip samples are
collected for each metre drilled and stored in segmented
plastic boxes for rotary drill holes.
Brine samples were collected at discrete depths during the
drilling using a double packer over a 1 m interval (to isolate
intervals of the sediments and obtain samples from airlifting
brine from the sediment interval isolated between the
packers). This equipment is from Geopro, a reputable
international supplier.
Additives and muds are used to maintain hole stability and
minimize sample washing away from the triple tube.
As the brine (mineralisation) samples are taken from inflows of
the brine into the hole (and not from the drill core – which has
variable recovery) they are largely independent of the quality
(recovery) of the core samples. However, the permeability of
the lithologies where samples are taken is related to the rate
and potentially lithium grade of brine inflows.
Sand, clay, silt, and minor occurrences of ignimbrite were
recovered in a triple tube diamond core drill tube, or as chip
samples from rotary drill holes, and examined for geologic
logging by a geologist and a photo taken for reference.
Diamond holes are logged by a geologist who also supervised
taking of samples for laboratory porosity analysis (with samples
drilled and collected in lexan polycarbonate tubes) as well as
additional physical property testing.
Logging is both qualitative and quantitative in nature. The
relative proportions of different lithologies which have a direct
bearing on the overall porosity, contained and potentially
extractable brine are noted, as are more qualitative
characteristics such as the sedimentary facies and their
relationships. Cores are photographed for reference, prior to
storage.
Brine samples were collected by inflatable packer, bailer and
spear sampling methods, over a variable interval. Low pressure
airlift tests are used as well to purge test interval and gauge
potential yields (brine flows).
The brine sample was collected in one-litre sample bottles,
rinsed and filled with brine. Each bottle was taped and marked
with the sample number. Duplicates were taken and submitted
with standards as part of the QA/QC protocols.
Quality of
assay data
and
laboratory
tests
•
•
•
Verification of
sampling and
assaying
•
•
•
•
The nature, quality and
appropriateness of the assaying and
laboratory procedures used and
whether the technique is considered
partial or total.
For geophysical tools,
spectrometers, handheld XRF
instruments, etc, the parameters
used in determining the analysis
including instrument make and
model, reading times, calibrations
factors applied and their derivation,
etc.
Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory
checks) and whether acceptable
levels of accuracy (i.e. lack of bias)
and precision have been
established.
•
The verification of significant
intersections by either independent
or alternative company personnel.
The use of twinned holes.
Documentation of primary data,
data entry procedures, data
verification, data storage (physical
and electronic) protocols.
•
Discuss any adjustment to assay
data.
•
•
•
•
•
•
Location of
data points
Accuracy and quality of surveys
used to locate drill holes (collar and
down-hole surveys), trenches, mine
workings and other locations used
in Mineral Resource estimation.
Specification of the grid system
used.
•
•
•
Data spacing
and
distribution
•
•
•
Quality
and
adequacy
of
topographic control.
Data spacing for reporting of
Exploration Results.
Whether the data spacing and
distribution is sufficient to establish
the degree of geological and grade
continuity appropriate for the
Mineral Resource and Ore Reserve
estimation procedure(s) and
classifications applied.
Whether sample compositing has
been applied.
•
•
•
•
•
The laboratory services of Alex Stewart International Argentina
Jujuy, Argentina, is used as the primary laboratory to conduct
the assaying of the brine samples collected as part of the
sampling program. The SGS laboratory in Buenos Aires has also
been used for both primary and check samples. They also
analysed blind control samples and duplicates in the analysis
chain. The Alex Stewart laboratory and the SGS laboratory are
ISO 9001 and ISO 14001 certified, and are specialized in the
chemical analysis of brines and inorganic salts, with experience
in this field. This includes the oversight of the experienced Alex
Stewart Argentina S.A. laboratory in Mendoza, Argentina,
which has been operating for a considerable period.
The quality control and analytical procedures used at the Alex
Stewart laboratory or SGS laboratory are considered to be of
high quality and comparable to those employed by ISO
certified laboratories specializing in analysis of brines and
inorganic salts.
QA/QC samples include field duplicates, standards and blank
samples.
Field duplicates, standards and blanks will be used to monitor
potential contamination of samples and the repeatability of
analyses. Accuracy, the closeness of measurements to the
“true” or accepted value, has been monitored by the insertion
of standards, or reference samples, and by check analysis at an
independent (or umpire) laboratory.
Duplicate samples in the analysis chain were submitted to Alex
Stewart or SGS laboratories as unique samples (blind
duplicates) during the process
Stable blank samples (distilled water) were used to evaluate
potential sample contamination and will be inserted in future
to measure any potential cross contamination
Samples were analysed for conductivity using a hand-held
Hanna pH/EC multiprobe on site, to collect field parameters.
Regular calibration of the field equipment using standards and
buffers is being undertaken.
The diamond drill hole sample sites and rotary drill hole sites
were located with a hand-held GPS and later located by a
surveyor, with the majority of hole collars defined by the
surveyor.
The properties are located at the junction of the Argentine
POSGAR grid system Zone 2 and Zone 3 (within UTM 19) and in
WGS84 Zone 19 south. The Project is using Zone 2 as the
reference zone, as the critical infrastructure is located on the
edge of Zone 2.
Drill holes in the central area where Measured resources have
been defined have a spacing of approximately 1.5 km between
drill holes, with a greater spacing in the area where Inferred
resources have been defined.
Brine samples were generally collected over 1m intervals from
straddle packers, with samples collected at variable intervals
vertically, due to varying hole conditions and over the life of
the Project different sampling techniques. The average
distance between samples is approximately 28 m.
Compositing has been applied to porosity data obtained from
the BMR geophysical tool, as data is collected at closer than 10
cm intervals, providing extensive data, particularly compared
to the available assay data.
Orientation of
data in
relation to
geological
structure
•
•
Sample
security
•
Whether the orientation of
sampling achieves unbiased
sampling of possible structures and
the extent to which this is known,
considering the deposit type.
If the relationship between the
drilling orientation and the
orientation of key mineralised
structures is considered to have
introduced a sampling bias, this
should be assessed and reported if
material.
•
The measures taken to ensure
sample security.
•
•
•
Review (and
Audit)
•
The results of any audits or reviews
of sampling techniques and data.
•
The salt lake (salar) deposits that contain lithium-bearing
brines generally have horizontal to sub-horizontal beds and
lenses that contain sand, gravel, salt, silt and clay. The vertical
diamond drill and rotary holes provide the best understanding
of the stratigraphy and the nature of the sub-surface brine
bearing aquifers.
Geological structures are important for the formation of salar
basins, but not as a host to brine miner
Share your feedback